flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CannonDesign acquires Astorino, forms design-led design-build division

CannonDesign acquires Astorino, forms design-led design-build division

The merger also extends CannonDesign’s presence in the markets Astorino currently serves, namely Pittsburgh and Abu Dhabi.


By CannonDesign | December 10, 2014

CannonDesign is acquiring and merging with Astorino, a Pittsburgh-based multidisciplinary firm in a deal that strengthens processes, assets, and opportunities for both firms. The merger increases collective capabilities, opens new markets, and enhances value for clients.

The firms cited their close alignment on values, vision, and culture as the foundation of the new relationship—both CannonDesign and Astorino place a premium on design solutions that address unique challenges faced by clients. 

“Together, our talented professionals will pursue outcome-based design solutions that optimize our clients’ performance,” commented Gary Miller, Co-Chairman and CEO of CannonDesign. “This merger brings added value and opportunity to both organizations.” 

The merger also extends CannonDesign’s presence in the markets Astorino currently serves and positions the firm to expand capabilities into industry innovations for project delivery offering increased choices for clients.  

A Design-Led Design-Build division to be managed from the Pittsburgh office will advance innovative methods for project delivery. Louis P. Astorino, Jr., who spearheaded Astorino’s Design Led-Design Build practice group during the last decade, will lead this strategic growth initiative nationwide.

“CannonDesign is a recognized global leader, and we’ve partnered on projects in the past,” said Louis Astorino, Jr., CEO of Astorino.  “We are compatible in culture, and complementary in talent, experience and capabilities. This is a superb opportunity for our team to work with CannonDesign’s professionals to expand and innovate.”  

While strengthening the firm’s existing focus on healthcare, education, and corporate commercial markets, CannonDesign will gain access to Astorino’s breadth and depth of talent and experience in both standard architectural services as well as innovative processes in research, design, and construction. The firm also will gain access to a valued network of relationships in Pittsburgh and Abu Dhabi, vibrant regions with high growth potential.

Related Stories

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

| Oct 5, 2011

GREENBUILD 2011: Software an architectural game changer

Interactive modeling software transforms the design­build process. 

| Oct 5, 2011

GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes

Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware.

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

| Oct 5, 2011

GREENBUILD 2011: Solar PV canopy system expanded for architectural market

Turnkey systems create an aesthetic architectural power plant. 

| Oct 5, 2011

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011

In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, exhibitor highlights its new products with ecological awareness. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021