flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A carbon-neutral-ready university campus opens in Hong Kong

University Buildings

A carbon-neutral-ready university campus opens in Hong Kong

At 6 million square feet, the first phase of the Hong Kong University of Science and Technology Guangzhou campus serves over 4,000 graduate students and 400 faculty members.


By Novid Parsi, Contributing Editor | October 18, 2022
Hong Kong University ext 1
Credit Zhang Chao Courtesy KPF.

In early September, the Hong Kong University of Science and Technology (HKUST) officially opened its new, KPF-designed campus in Nansha, Guangzhou (GZ). The carbon-neutral-ready campus was planned, designed, and built in three years’ time, with a project team comprising over 70 architects and planners across KPF offices in New York, Shanghai, Hong Kong, and Singapore.

The project’s first phase includes nearly 6 million square feet (about 550,000 square meters) for over 4,000 graduate students and 400 faculty members. It provides research facilities for subjects such as robotics and autonomous systems, smart manufacturing and transportation, microelectronics, and atmosphere and ocean systems.

Rather than following a traditional academic structure based on schools and disciplines, HKUST(GZ) centers around a project-based learning model that encourages multi-disciplinary interactions. The campus features eight research and lab buildings, connected by shaded arcades, and a full range of teaching spaces, including seminar classrooms, labs, large lecture halls, maker spaces, and collaborative workspaces. 

“Landscape and building spaces come together to create an atmosphere where scientists will be energized and inspired to innovate,” James von Klemperer, KPF president, said in a statement.

From day one, HKUST(GZ) achieves a 54 percent reduction of carbon emissions, with a goal of reaching carbon neutrality before 2060. The plan’s environmental and resiliency measures have been designed for Guangzhou’s hot, humid climate and the rapidly urbanizing area’s flooding, seismic, and climate change risks.

When complete, the campus will accommodate more than 10,000 students and faculty. And it will integrate teaching and learning facilities with housing, neighborhood and campus retail, student life programs, administration, hotel, office and incubator spaces, and athletics facilities. 

The HKUST(GZ) campus adds to KPF’s portfolio of research, innovation, and academic facilities around the world, including the CUNY Advanced Science Research Centers in New York City, the University of Michigan’s Detroit Center for Innovation, and NYU’s new Qiantan campus in Shanghai.

 

On the Building Team:
Owner: Hong Kong University of Science and Technology
Design architect: Kohn Pedersen Fox (KPF) 
Architect of record: SCAD (Architectural Design & Research Institute of South China University of Technology Co.)
MEP engineer: ARUP
Structural engineer: ARUP
Landscape design: James Corner Field Operations
General contractor/construction manager: central hub: China Railway First Group Co. and China Railway Guangzhou Engineering Group Co.; other areas:
Canton One Construction Group Co. and Guangzhou Construction Engineering Co.

Hong Kong University ext 2
Credit Zhang Chao Courtesy KPF.
Hong Kong University ext 3
Credit Zhang Chao Courtesy KPF.

 

Related Stories

University Buildings | Nov 18, 2016

Stephen F. Austin State University’s new STEM building breaks ground

Kirksey Architecture designed the building that ‘will serve as a landmark for SFA.’

University Buildings | Oct 25, 2016

Columbia University dedicates its new campus with great fanfare

Transparency to the surrounding community played a big role in the campus’s design.

School Construction | Oct 23, 2016

As construction rebounds, education sector spending flattens

Post-recession slump suggests a settling in at a “normal” level similar to the mid aughts.

University Buildings | Oct 19, 2016

UC Merced to nearly double its size by 2020

Its growth strategy includes adding 1.2 million sf of space for teaching, housing, and research. 

University Buildings | Oct 12, 2016

The new Hancher Auditorium opens on University of Iowa campus

The building replaces the previous Hancher, which was irreparably damaged in the 2008 flood.

University Buildings | Oct 11, 2016

The University of Iowa gets a new Visual Arts Building

The building was a collaborative effort between BNIM and Steven Holl Architects and marks the sixth facility the two firms have worked together on

Sponsored | University Buildings | Oct 3, 2016

Enhancing university life: The smart shower bead

Residential spaces that need to meet high traffic demands while accommodating an ever-changing populace creates a unique set of obstacles for any educational institution’s housing.

Sponsored | University Buildings | Sep 29, 2016

UWM’s Kenwood Interdisciplinary Research Complex: The most distinctive building on campus

The largest building on campus, it was designed by Flad Architects to comply with LEED Gold Certification standards and to meet a wide range of current and future academic needs.

University Buildings | Sep 12, 2016

The University of Chicago’s newest residence halls are designed to be more like home

Abundant common spaces give students more chances to interact.

University Buildings | Aug 17, 2016

Supporting communities of motivated learners: reflections on SCUP-51

The two themes that were consistently woven into different topics were institutional transformation and connection with students.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021