flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cardiff is home to the new BBC Cymru Wales headquarters

Office Buildings

Cardiff is home to the new BBC Cymru Wales headquarters

Foster + Partners designed the building.


By David Malone, Associate Editor | April 25, 2018
Aerial View of the new BBC Wales HQ

Rendering courtesy of Foster + Partners.

Located on the site of a former bus station just opposite Cardiff Central Station in Wales, the new 25,600-sm BBC Cymru Wales Headquarters combines studio, administration, and support spaces in a single, flexible building.

The Foster + Partners-designed building emphasizes transparency and openness. Upon entering the ground floor, visitors and employees can look up through a full-height atrium into the working spaces above and into a new cafe facing the square. A 4,000-sm hub is the heart of the HQ building and extends across three linked levels and incorporates studios, offices, and production facilities. A sheltered garden sits atop the hub and is connected to a restaurant. This space provides a unique venue for filming and is a social amenity for the approximately 1,200 staff.

 

 

There are about 750 desks throughout the building because it is not expected that all 1,200 staff members will occupy the building concurrently.

ISG built the project and Overbury and Sheppard Robson handled the internal fit out of the building.

 

See Also: 18 Carbon fiber wings grace Foster + Partners-designed Apple Dubai Mall terrace

 

Work spaces and amenities overlooking the full-height atrium in the BBC Wales HQRendering courtesy of Foster + Partners.

 

Social amenity space at BBC Wales HQPhoto courtesy of Foster + Partners.

 

Atrium space at BBC Wales HQPhoto courtesy Foster + Partners.

 

BBC Wales HQ under constructionPhoto courtesy Foster + Partners.

 

 

Related Stories

Game Changers | Feb 4, 2016

GAME CHANGERS: 6 projects that rewrite the rules of commercial design and construction

BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.

Mixed-Use | Jan 25, 2016

SOM unveils renderings of dual-tower Manhattan West development

The five million-sf project includes two office towers, a residential tower, retail space, and a new public square.

Office Buildings | Jan 21, 2016

Nike reveals design, first images of planned 3.2 million-sf expansion to its world headquarters

The expansion looks to combine design elements inspired by human movement, speed, and the strength and energy of competition.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Office Buildings | Jan 14, 2016

JLL: Slowdown not expected for office market

The booming sector had an occupancy growth rate 1.3 times that of new supply in the fourth quarter of 2015.

Office Buildings | Jan 11, 2016

Spec for tech: Designing for the creative class

The new work environment, settings which blur the line between work and life, is inspired by cities and the attributes that all great urban environments share, writes Ben Tranel of Gensler.

Office Buildings | Jan 6, 2016

4 tips for creating flow in a multi-level workspace

Successful workplaces enable a clear progression of ideas and people, which can be challenging for workplaces that occupy multiple levels. Perkins+Will's Sarah Stanford found some strategies that have proven successful.

Office Buildings | Dec 23, 2015

Good design alone won’t eradicate mindless meetings

Gensler's Johnathan Sandler discusses efficient alternatives to dull, wasteful workplace meetings. 

Office Buildings | Dec 17, 2015

John Buck Company to develop CNA’s Chicago headquarters

The 35-story building will have plenty of column-free space.  

Office Buildings | Dec 9, 2015

HOK collaborates with IFMA on new workplace strategy research report

Report cites work-life balance as the top reason for implementing “distributed work” strategies.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021