flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cauceglia to lead Allsteel’s global accounts

Cauceglia to lead Allsteel’s global accounts


By By BD+C Staff | October 3, 2011
Mary Tierney Cauceglia

 

Mary Tierney Cauceglia has been appointed vice president of global accounts at Allsteel Inc, a newly created position. In making the announcement, Malisa Bryant, Allsteel’s vice president of sales, said that Cauceglia is responsible for developing new global business strategies and expanding existing business within the Fortune 500 sector.

“We are thrilled to have Tierney on our team,” said Bryant. “Her impeccable resume and leadership capabilities are sure to inspire our sales team and accelerate Allsteel’s global expansion.”

An industry veteran, Cauceglia joins Allsteel after an 18-year tenure at Herman Miller, where she most recently was director of strategic accounts. She is a graduate of the University of Maryland. Her professional affiliations include the Strategic Account Management Association and Corenet. Cauceglia is based in Muscatine. BD+C

Related Stories

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 14, 2012

Hyatt joins Thornton Tomasetti as VP in Chicago

A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.

| Mar 14, 2012

Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.

Building will house research into personalized, gene-based cancer screening and treatment.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Commercial glazer Harmon expanding into Texas

Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021