flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Celebrating brick in architecture

Celebrating brick in architecture

The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials.


October 9, 2012
This article first appeared in the October 2012 issue of BD+C.

The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials. On these pages are several of the “Best in Class Winners” from this year’s BIA competition.

Wylie Civic Complex

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Wylie (Texas) Civic Complex weaves three public uses—city hall, recreation center, and public library—within a single tight design concept. The 137,000-sf complex, best in the municipal/government/civic category, attained LEED Silver certification. Architect: Holzman Moss Bottino Architecture, in association with Architexas. Mason contractor: DMG Masonry Ltd.

Bud Clark Commons

 

 

 

 

 

 

 

 

 

In the multifamily category, the award goes to Bud Clark Commons, which is described as a “centerpiece of the Portland’s plan to end homelessness.” The LEED Platinum apartment complex provides housing and comprehensive social services to the Oregon city’s homeless population. Architect: Holst Architecture. Mason contractor: J&S Masonry.

VIP Community Services, Men’s Residences

 

 

 

 

 

 

 

 

 

Honors in healthcare facilities go to the Men’s Residences facility in the East Tremont section of the Bronx, N.Y., a project of the Bronx-based nonprofit housing group VIP Community Services. This five-story, 30,000-sf facility provides housing, dining facilitiies, vocational training, and therapy for 80 men in addiction recovery. Architect/landscape architect: WASA/Studio A. Mason contractor: Procida Construction.

DuPage A.M.E. Chapel and Administrative Wing

 

 

 

 

 

 

 

 

 

The DuPage A.M.E. Chapel, the winner among houses of worship, provides a second chapel for this fast-growing congregation in Lisle, Ill., as well as a children’s church, classrooms, administrative offices, and a fellowship room. Architect: Harding Partners. Contractor: Moreton Construction. Mason contractor: J and E Duff.

Ogden International School of Chicago

 

 

 

 

 

 

 

 

 

 

 

Located on the site of an aging and overcrowded Chicago Public Schools building, the 110,000-sf K-8 school varies in design from the CPS prototype to reflect the uniqueness of Ogden’s international baccalaureate program. Architect: Nagle Hartray Architecture. Associate architect: Schroeder Murchie Niemiec Gazda-Auskalnis. Landscape architect: Terry Guen Design Associates. Contractor: Turner Construction Co. Mason contractor: Illinois Masonry Corp. +

Related Stories

Office Buildings | Mar 21, 2024

BOMA updates floor measurement standard for office buildings

The Building Owners and Managers Association (BOMA) International has released its latest floor measurement standard for office buildings, BOMA 2024 for Office Buildings – ANSI/BOMA Z65.1-2024.

Healthcare Facilities | Mar 18, 2024

A modular construction solution to the mental healthcare crisis

Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.

Codes and Standards | Mar 18, 2024

New urban stormwater policies treat rainwater as a resource

U.S. cities are revamping how they handle stormwater to reduce flooding and capture rainfall and recharge aquifers. New policies reflect a change in mindset from treating stormwater as a nuisance to be quickly diverted away to capturing it as a resource.

Plumbing | Mar 18, 2024

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 

MFPRO+ New Projects | Mar 18, 2024

Luxury apartments in New York restore and renovate a century-old residential building

COOKFOX Architects has completed a luxury apartment building at 378 West End Avenue in New York City. The project restored and renovated the original residence built in 1915, while extending a new structure east on West 78th Street. 

Multifamily Housing | Mar 18, 2024

YWCA building in Boston’s Back Bay converted into 210 affordable rental apartments

Renovation of YWCA at 140 Clarendon Street will serve 111 previously unhoused families and individuals.

Healthcare Facilities | Mar 17, 2024

5 criteria to optimize medical office design

Healthcare designers need to consider privacy, separate areas for practitioners, natural light, outdoor spaces, and thoughtful selection of materials for medical office buildings.

Construction Costs | Mar 15, 2024

Retail center construction costs for 2024

Data from Gordian shows the most recent costs per square foot for restaurants, social clubs, one-story department stores, retail stores and movie theaters in select cities.

Architects | Mar 15, 2024

4 ways to streamline your architectural practice

Vessel Architecture's Lindsay Straatmann highlights four habits that have helped her discover the key to mastering efficiency as an architect.

Healthcare Facilities | Mar 15, 2024

First comprehensive cancer hospital in Dubai to host specialized multidisciplinary care

Stantec was selected to lead the design team for the Hamdan Bin Rashid Cancer Hospital, Dubai’s first integrated, comprehensive cancer hospital. Named in honor of the late Sheikh Hamdan Bin Rashid Al Maktoum, the hospital is scheduled to open to patients in 2026.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021