flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Celebrating brick in architecture

Celebrating brick in architecture

The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials.


October 9, 2012
This article first appeared in the October 2012 issue of BD+C.

The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials. On these pages are several of the “Best in Class Winners” from this year’s BIA competition.

Wylie Civic Complex

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Wylie (Texas) Civic Complex weaves three public uses—city hall, recreation center, and public library—within a single tight design concept. The 137,000-sf complex, best in the municipal/government/civic category, attained LEED Silver certification. Architect: Holzman Moss Bottino Architecture, in association with Architexas. Mason contractor: DMG Masonry Ltd.

Bud Clark Commons

 

 

 

 

 

 

 

 

 

In the multifamily category, the award goes to Bud Clark Commons, which is described as a “centerpiece of the Portland’s plan to end homelessness.” The LEED Platinum apartment complex provides housing and comprehensive social services to the Oregon city’s homeless population. Architect: Holst Architecture. Mason contractor: J&S Masonry.

VIP Community Services, Men’s Residences

 

 

 

 

 

 

 

 

 

Honors in healthcare facilities go to the Men’s Residences facility in the East Tremont section of the Bronx, N.Y., a project of the Bronx-based nonprofit housing group VIP Community Services. This five-story, 30,000-sf facility provides housing, dining facilitiies, vocational training, and therapy for 80 men in addiction recovery. Architect/landscape architect: WASA/Studio A. Mason contractor: Procida Construction.

DuPage A.M.E. Chapel and Administrative Wing

 

 

 

 

 

 

 

 

 

The DuPage A.M.E. Chapel, the winner among houses of worship, provides a second chapel for this fast-growing congregation in Lisle, Ill., as well as a children’s church, classrooms, administrative offices, and a fellowship room. Architect: Harding Partners. Contractor: Moreton Construction. Mason contractor: J and E Duff.

Ogden International School of Chicago

 

 

 

 

 

 

 

 

 

 

 

Located on the site of an aging and overcrowded Chicago Public Schools building, the 110,000-sf K-8 school varies in design from the CPS prototype to reflect the uniqueness of Ogden’s international baccalaureate program. Architect: Nagle Hartray Architecture. Associate architect: Schroeder Murchie Niemiec Gazda-Auskalnis. Landscape architect: Terry Guen Design Associates. Contractor: Turner Construction Co. Mason contractor: Illinois Masonry Corp. +

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021