flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Center for Engineering, Innovation, and Sciences opens on Wentworth Institute of Technology’s Boston campus

University Buildings

Center for Engineering, Innovation, and Sciences opens on Wentworth Institute of Technology’s Boston campus

Leers Weinzapfel Associates designed the building.


By David Malone, Assocaite Editor | May 7, 2019

All photos: Albert Vecerka

Wentworth Institute of Technology’s first new academic building in 45 years was recently completed on the university’s Boston campus. The Leers Weinzapfel Associates-designed Center for Engineering, Innovation, and Sciences is a multi-disciplinary facility meant to expand the school’s engineering education.

The four-story, 75,000-sf facility will offer an environment for students of biology, civil engineering, mechanical engineering,  biomedical engineering, and biological engineering to collaborate. The building’s ground floor houses an additive manufacturing lab and Accelerate, an interdisciplinary and entrepreneurial project-based program. Floors two through four include laboratories, student learning and meeting spaces, offices, and support/storage space.

 

 

The campus is vulnerable to flooding, so the Center’s ground floor was built two feet above current grade and the design minimized the systems equipment in the basement. Sustainability elements include a highly-efficient thermal envelope that includes sun shading on the east, south, and west facades, and mechanical equipment designed for maximum efficiency. The facility is targeting Leed Silver certification.

 

See Also: ‘One Harvard’ initiative injects new life into campus center

 

The Center for Engineering, Innovation, and Sciences opened in November 2018.

 

Related Stories

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

University Buildings | May 17, 2021

Carolina Gaming Arena completes at UNC Chapel Hill

Clark Nexsen designed the project.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

University Buildings | May 13, 2021

Education Building II at UC Riverside receives final approval

Hensel Phelps + CO Architects will be the design-build team for the project.

Healthcare Facilities | May 5, 2021

HOK to design new Waterloo Eye Institute

The project is being designed for The University of Waterloo’s School of Optometry & Vision Science.

University Buildings | May 4, 2021

UMass Medical School’s new Education and Research Building

ZGF and ARC/Architectural Resources Cambridge are designing the project.

University Buildings | Apr 29, 2021

Perkins&Will to design new gateway building for the University of British Columbia

The building will transform the arrival experience for students, staff, and visitors.

University Buildings | Apr 29, 2021

The Weekly Show, April 29, 2021: COVID-19's impact on campus planning, and bird management strategies

This week on The Weekly show, BD+C Senior Editor John Caulfield interviews a duo of industry experts on 1) how campus planning has changed during the pandemic and 2) managing bird infestations on construction sites and completed buildings.

University Buildings | Apr 19, 2021

Duke University’s Wilkinson Building completes

Bohlin Cywinski Jackson designed the project.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021