Young Conaway Stargatt & Taylor, LLP moved into its new headquarters, a former Federal building, after extensive renovations by architecture firm Francis Cauffman. Young Conaway is the sole tenant of the notable Daniel L. Herrmann Courthouse in downtown Wilmington. The 233,880-sf. courthouse had been vacant since 2002. Â .
The renovated courthouse comprises four floors and a mezzanine. The entrance features a two-story atrium that is now the heart of Young Conaway’s public and collaboration areas. Francis Cauffman restored the central bronze stairwell, and the refurbished natural stone and chiseled marble in the atrium augment the clean, streamlined interior. The first floor has flexible conference rooms while the mezzanine floor contains a visiting attorney strategy suite, a mock trial room, additional conference rooms, and access to an outdoor plaza. Â
The U-shaped building boasts a large outdoor plaza with an urban garden lit by the building’s original ornate lampposts. The outdoor plaza can accommodate up to 300 people for events. The design firm added a 100-car garage beneath the building, making parking quick and easy for the downtown location.
To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building. This included laying the foundations and creating infrastructure for the future addition. BD+C
Related Stories
| Nov 29, 2011
Turner Construction establishes partnership with Clark Builders
Partnership advances growth in the Canadian marketplace.
| Nov 29, 2011
AIA launches stalled projects database
To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.Â
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.