flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Changes to ICC building codes development process aimed at more in-depth vetting of proposals

Codes and Standards

Changes to ICC building codes development process aimed at more in-depth vetting of proposals

The new process will provide more opportunity for proponents to build consensus on code changes.


By PETER FABRIS, CONTRIBUTING EDITOR | March 24, 2023
Photo: Nathan Waters via Unsplash
Photo: Nathan Waters via Unsplash

The International Code Council (ICC) is revising its code development process to provide more in-depth scrutiny of code change proposals.

The changes will take effect in 2024-2026 for the development of the 2027 International Codes (I-Codes). They will move the development process to an integrated and continuous three-year cycle.

In the new timeline, the first year will include two Committee Action Hearings for Group A Codes; year two will include two Committee Action Hearings for Group B Codes; and year three will be the joint Public Comment Hearings and Online Governmental Consensus Vote for both Group A and B Codes.

“The addition of the second Committee Actions Hearings in year one and two will foster a more in-depth vetting of code change proposals, allowing an opportunity for the committee members to review and evaluate the original proposals and consider the submitted responses,” according to an ICC news release. “This also provides more opportunity for proponents to build consensus for their code change proposal and ensure the best version of their intended improvement to the existing codes.”

With combined Public Comment Hearings in the third year, voting members will be able to vote on all suggested changes to the next edition of the I-Codes at one time, the release says. The updated process also provides more opportunity for proposed new referenced standards to be developed and finalized on a consistent timeline regardless of the group (Group A or B) with which they are associated.

Related Stories

| Jul 5, 2012

Roof membrane could have prevented roof parking deck collapse, specialist says

The collapse of a section of a roof parking deck at the Algo Centre Mall in Elliot Lake in Ontario, Canada could have been prevented if the structure had a membrane, according to a concrete expert and specialist in structure analysis at McMaster University.

| Jul 5, 2012

New Joplin, Mo. hospital being built to withstand tornado that destroyed predecessor

After the May 22, 2011, EF-5 tornado destroyed St. John’s Regional Medical Center in Joplin, Mo., architects and engineers analyzed how the nine-story structure reacted to the storm.

| Jul 5, 2012

Continued tax breaks necessary for widespread adoption of net zero buildings

Tax breaks passed by the U.S. government to encourage construction of green buildings are set to expire in 2012 and 2013.

| Jun 28, 2012

Six buildings now recognized under Living Building Challenge

The Living Building Challenge (LBC), a green ratings system for design and construction that judges a building based on its actual performance, not just its projected performance at the design stage, has recognized six buildings to date.

| Jun 28, 2012

Label for building products will have ‘global warming number’

The director of the 2030 Challenge for Products says that the organization is aiming to place a label on building products that will list what’s in it, and how much embodied carbon each product represents.

| Jun 28, 2012

Top building material executive urges building resilience in sustainability standards

A meeting of 1,000 business executives at the recent Rio+20 environmental conference featured a passionate plea to include building resilience in efforts to boost sustainability.

| Jun 28, 2012

Following spate of skyscraper balcony glass panel breakages, Ontario adopts code change

Ontario's housing minister announced new building code rules to help prevent glass panels from breaking off high-rise balconies during hot weather.

| Jun 28, 2012

Factory worker deaths in Italy raise questions on building codes after earthquakes

Italian officials are questioning seismic building standards and inspection procedures in the aftermath of two damaging earthquakes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021