For the Chicago Cubs, next year is here, at least in the literal sense. They play the Cincinnati Reds on Monday for their home opener, the first game at Wrigley Field in a promising 2016 season.
The game also marks the progression of the 1060 Project. Wrigley is in the process of modernization, and the latest update is that the Cubs’ new clubhouse is ready and the legendary marquee sign has been installed out front.
Wrigley’s old clubhouse, one of the worst in the majors, was 11,000 sf, a size that was acceptable generations ago but woefully small compared to the high tech, posh living rooms around the league. According to the Chicago Tribune, the new clubhouse is 30,000 sf. The space accommodates a larger locker room, a strength and conditioning center, training rooms, offices, and a lounge. The circular locker room has wood-paneled stalls centered around a central meeting area.
Home sweet(er) home! #LetsGohttps://t.co/A4qZxRGcZN
— Chicago Cubs (@Cubs) April 11, 2016
To find the space, the clubhouse was moved from the area underneath the seats behind the dugout to under an old parking lot on the west side of the ballpark. The old locker room will be turned into a batting cage. An open-air plaza will be built above the clubhouse.
Additionally, the signature red Wrigley Field marquee has been re-installed outside of the main entrance. EarthCam produced a time-lapsed video of crews putting it back together.
The Cubs are nowhere near done with the Wrigley overhaul. New clubs, decks, and outdoor concourses are being constructed, and a new umpire dressing room, visitors’ clubhouse, and press box are all in the works.
An outside development, including a six-story office building, 172-room hotel, open air plaza, and a bunch of commercial development spaces (restaurants, retail shops, an ice rink) will be built over the next few years.
The renovations started last year, when the Cubs revamped their outfield bleachers and erected two massive video boards.
Related Stories
| Jun 14, 2012
Minnesota Vikings stadium plan gets legislative go-ahead
Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.
| Jun 8, 2012
Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex
Casaccio Yu Architects designed the 11,300-sf fitness and social complex.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 16, 2012
AEG releases 3D video of L.A.'s Farmers Field
The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.
| May 7, 2012
2012 BUILDING TEAM AWARDS: TD Ameritrade Park
The new stadium for the College World Series in Omaha combines big-league amenities within a traditional minor league atmosphere.
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.