The McCaffery Interests and U.S. Steel Corp.’s master plan for Chicago Lakeside, designed by Skidmore Owings & Merrill LLP (SOM), has been named one of 10 finalists for the first Sustainia Award. The project was named to the Sustainia100 in July at the United Nation’s Rio+21 conference as one of 100 projects and ideas from 56 countries that represent the best ideas for sustainability in the world. The inaugural Sustainia Award will “honor the best sustainable solution,” according to organizers.
The winners of the Sustainia Award and the associated Community Award will be announced on Oct. 11 by former California Gov. Arnold Schwarzenegger during a ceremony at the Royal Theater in Copenhagen. Selection of the Sustainia Award winner will be made by a jury consisting of Gov. Schwarzenegger, former Prime Minister of Norway Gro Harlem Brundtland, Intergovernmental Panel on Climate Change (IPCC) Chair Dr. Rajendra K. Pachauri and EU Commissioner of Climate Action Connie Hedegaard. The Community Award winner will be chosen by the general public via voting through Sustainia’s large social media community.
Chicago Lakeside sits on a site of almost 600 acres along Chicago’s Lake Michigan shore. Formerly home to a steel mill, the land is devoid of infrastructure—creating an opportunity to develop the prime lakefront real estate as a 21st century neighborhood.
Plans include a rich mix of proposed uses, including over 15,000 residential units and more than 15-million-square-feet of retail, restaurants, commercial, institutional and research and development facilities. Open space will include two miles of new park land along the shores of Lake Michigan, extending the lakefront park system originally envisioned by Daniel Burnham in his legendary 1909 Plan of Chicago.
The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill. Lakeside has assembled an international leadership team in the design of future-focused infrastructures – in water and energy conservation, transportation and personal mobility, renewable energy and digital connectivity.
The first work since the demolition of the U.S. Steel South Works more than 20 years ago began earlier this spring when construction began on the extension of Lake Shore Drive through the site between 79th and 87th Streets. The road is scheduled to be complete by December with landscaping work finished in spring 2013, helping to speed commutes for local residents and setting the stage for the initial construction of buildings within Chicago Lakeside soon afterwards. +
Related Stories
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
BIM and Information Technology | Apr 9, 2015
A carboard box by Google can bring virtual reality to architecture
The global search engine giant has launched a new product, Google Cardboard, that easily allows users to experience virtual reality.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.