flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

China Accord: Design firms sign pledge to tackle climate change

Architects

China Accord: Design firms sign pledge to tackle climate change

52 companies will collaborate to reduce carbon emissions.


By Peter Fabris, Contributing Editor | November 2, 2015
China Accord: Design firms sign pledge to tackle climate change

An oil refinery in Qixia, Nanjing, China. Photo: Vmenkov/Wikimedia Commons.

A meeting of 52 key Chinese and international architecture and planning firms yielded the China Accord—a pledge to cooperatively lower carbon emissions in the built environment.

The meeting was hosted by the China Exploration and Design Association – Architecture Branch (CEDAAB) and by Architecture 2030. “We understand our moral and professional responsibility to address the issue of greenhouse gas emissions if we are to stay within the 2° C threshold established by the international scientific community, and the Accord is just the beginning of our joint efforts,” said Ed Mazria, Architecture 2030 Founder and CEO. “We have a long and exciting road ahead of us to decarbonize the built environment.”

The China Accord supports the Chinese government’s targets to peak and begin reducing carbon emissions, as well as the State Council’s Green Buildings Action Plan and the recent China-US Joint Presidential Statement on Climate Change. A number of initiatives will result from the Accord, including professional training, knowledge-sharing events and programs, a broad-based stakeholders’ forum, and the localization of design and planning strategies utilizing real-time simulation tools.

Among the international firm signatories were DLR Group, Skidmore Owings & Merrill, ARUP, Gensler, CallisonRTKL, HKS Architects, Perkins+Will, HDR, and Glumac.

Tags

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021