In Norfolk, Va., the Chrysler Museum of Art’s Perry Glass Studio, an educational facility for glassmaking, will open a new addition this summer. That will be followed by a renovation of the existing building scheduled for completion this winter.
The design by Work Program Architects clads the studio expansion in terracotta panels and brick veneer, referencing glass art’s firing process. A new transparent museum front welcomes visitors from all sides. It also creates a connection between the museum and the city’s downtown arts neighborhood, the NEON District. Visitors will be guided to NEON by a path decorated with a series of wayfinding glass “breadcrumbs.”
As soon as they enter, visitors will see the furnaces of the theater-style performance hot shop, which allows artists to work with glass in its molten state. A focal point, the hot shop will display the art of glassblowing. The glassmaking studios (including flat, flame, cold, and mold shops), wood and metal shops, and classrooms will offer artists space to hone their craft, while also allowing visitors to explore glass art.
A roof terrace offers views of the Chrysler Museum, the Hague, and the Elizabeth River. The project also includes an event space, retail area, and catering kitchen.
In light of the area’s recurring flooding events, the new addition has been raised four feet above the existing glass studio to keep it above the floodplain.
The design’s other coastal resilience strategies include native, salt-tolerant plantings; cisterns to collect rainwater for summer irrigation; onsite water storage; new trees and protection of existing trees to absorb water; and landscaped areas that act as a green sponge.
On the Building Team:
Owner: Chrysler Museum of Art
Design architect and architect of record: Work Program Architects
Structural engineer: Speight Marshall Francis
Landscape architects: Stromberg Garrigan & Associates, WPL
Civil engineer: Timmons Group
PME engineer: Altieri Sebor Wieber
Theater/AV/acoustics: NV5
Geotechnical: GET Solutions, Terracon
Envelope: REI Engineers
Contractor: Hourigan
Related Stories
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 18, 2014
Multi-level design elevates Bulgarian Children's Museum [slideshow]
Embodying the theme “little mountains,” the 35,000-sf museum will be located in a former college laboratory building in the Studenski-grad university precinct.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 15, 2014
12 award-winning structural steel buildings
Zaha Hadid's Broad Art Museum and One World Trade Center are among the projects honored by the American Institute of Steel Construction for excellence in structural steel design.
| Apr 9, 2014
Colossal aquarium in China sets five Guinness World Records
With its seven salt and fresh water aquariums, totaling 12.87 million gallons, the Chimelong Ocean Kingdom theme park is considered the world’s largest aquarium.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
Sponsored | | Mar 21, 2014
Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral
Linetec finishes Firestone’s UNA-CLAD panels, achieving a one-of-a-kind, dynamic appearance with the first use of Valspar’s new Kameleon Color
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.