In Cincinnati, Ohio, the Andrew J Brady Music Center aims to connect audiences with live music while transforming Cincinnati’s riverfront. Designed by GBBN, the project, which opened in mid-2021, intends to reshape how people throughout the region engage with public space on the banks of the Ohio River.
With its entrance facing the river, the venue can seat 4,400 people on three levels indoors and can host 8,800 people for the seasonal stage outdoors. Between the indoor and outdoor spaces, the Brady Center for Music can host 140 to 160 concert events a year.
The inside venue provides clear sightlines from all vantage points, whether from the floor or the balconies. That has been achieved with structural V columns that occupy less floor space and are less visually obstructive than straight, vertical columns, helping to ensure unobstructed views of the stage. The venue also includes dressing rooms, VIP spaces, and outdoor patios.
Outside, the venue features perforated, color-shifting metal panels as part of a Kolorshift system that creates a dynamic facade day or night. Called Purple Rain, the product ensures no two views of the exterior are ever the same. The center also provides multiple access points—the street, parking garage, and adjacent park—so that patrons can easily access the venue by foot, car, or shared ride.
Messer Construction poured 4,900 square feet of concrete for the stage, loading dock, and exterior areas. Fun fact: Someone who owns 2,250 albums could cover the entire square footage of the stage with their record collection.
Other Team Members:
Owner: Music Entertainment Management Inc.
Design architect and architect of record: GBBN
MEP engineer: CMTA and Veregy (formerly Dynamix Engineering)
Acoustics: Harvey Marshall Berling Associates
Structural engineer: THP
General contractor/construction manager: Messer Construction
Related Stories
Building Team | May 3, 2016
Piazza in San Francisco will feature a 92-foot stainless steel statue
Made of 2,500 seamlessly-welded panels, Venus will be the centerpiece of a new public piazza containing other works of art.
Building Team | Apr 6, 2016
Evaluating the value proposition of project vendors
CBRE Healthcare's Daniel Waters has a few pointers for Request for Proposal (RFP) writers and Project Managers when it comes to handling project vendors, including clearly defining performance expectations.
Building Team | Feb 25, 2016
Long-time BD+C editor Gordon Wright, 1939-2016
Gordon Wright, whose career at BD+C spanned 32 years, passed away on February 15, at the age of 76.
Building Team | Feb 10, 2016
DBIA disputes study claiming design-build projects often delivered on time, over budget
Says study did not account for owner-initiated scope changes.
Building Team | Jan 7, 2016
4 reasons the C-suite should care about design-led construction
Lou Astorino shares four examples how a unified approach can directly help C-suite leaders achieve their organizational goals.
Sponsored | Building Team | Dec 16, 2015
How to fix 3 common mistakes AEC teams make in project interviews
In a LinkedIn post, Scott Johnson, business writing specialist at Johnson Training Group, highlights three common missteps that AEC firms make during project interviews. His insights are based on more than 90 interviews conducted with members of various selection panels.
Sponsored | Building Team | Dec 7, 2015
Why employee advocacy is key to social media success
Employee advocacy is key to boosting social media engagement, and employee advocacy is about more than just the promotion of a firm’s brand.
Sponsored | Building Team | Nov 30, 2015
5 ways to bring data into marketing and business development
Here are five ways to use data to enhance the client acquisition process
Cultural Facilities | Nov 23, 2015
BIG plans for Pittsburgh: Bjarke Ingels’ Lower Hill District master plan evokes hilly topography
Paths will be carved to create a dialogue between Pittsburgh’s urbanscape and its hilly surroundings.
Sponsored | Building Team | Nov 17, 2015
The benefits of selling your firm to employees
One business advisor recommends professional services businesses to develop a group of employees who are willing and able to buy the business