The Construction Industry Service Corporation (CISCO) recently announced its Project of the Year winners as part of its annual Pride in Construction award program. Elmhurst Memorial Healthcare Integrated Healthcare Facility received top honors in the New Construction – Suburbs category. The result of a collaboration between construction manager Gilbane Building Company, Elmhurst staff, Pratt Design Studios, and Albert Khan Associates, this 50-acre integrated healthcare campus includes more than one million square feet of buildings and opened on time and on budget in July 2011.
Due to the complexity of the project, the construction team worked with Elmhurst and the design team to integrate the design and construction phases and effectively manage the aggressive construction schedule. Gilbane used Building Information Modeling and provided early full-scale prototype mockups of key rooms to help expedite construction while ensuring the highest quality
The project employed more than 2,000 tradespeople for a total of 2.1 million hours worked – all without a single lost-time accident. BD+C
Related Stories
| Aug 11, 2010
Great Solutions: Healthcare
11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.
| Aug 11, 2010
Great Solutions: Collaboration
9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.
| Aug 11, 2010
2009 Judging Panel
A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.
| Aug 11, 2010
Inspiring Offices: Office Design That Drives Creativity
Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.
| Aug 11, 2010
BIM school, green school: California's newest high-performance school
Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.