flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

citizenM’s American expansion now includes second hotel in Boston

Hotel Facilities

citizenM’s American expansion now includes second hotel in Boston

The Back Bay property is also the kickoff of a new mixed development.


By John Caulfield, Senior Editor | September 5, 2024
Exterior of citizenM Boston Back Bay hotel
citizenM's 15-story Boston Back Bay hotel is its 10th in the U.S. Images: Courtesy of citizenM

CitizenM has opened its largest hotel to date globally.

The 399-room citizenM Boston Back Bay is the brand’s second property in Boston. The 15-story 151,726-sf building was designed by citizenM’s longtime architecture partner, Concrete Amsterdam, with the Boston-based firm Elkus Manfredi Architects. CitizenM Boston Back Bay represents the brand’s 36th hotel worldwide, and continues the brand’s push into the U.S.: citizen M opened its first hotel in Austin last March, and its third Miami-area property, Miami South Beach, last month. With the Boston property, citizenM has 10 hotels in the U.S.

The Boston project’s codeveloper is Samuel & Associates, and its general contractor is Suffolk Construction. The cost of the hotel is confidential, according to the company.

Tight quarters: All of the rooms in citizenM Boston Back Bay are identical, and designed for two adults, with one extra-large bed to share. 

CitizenM promotes itself as an “affordable luxury” brand. Its hotel features wall-to-wall windows, luxury bedding and towels, and iPad room controls. The facility’s highlights include The Living Room, with books, art, designer furniture and designated workspaces; collectionM, a retail space on the first floor with travel essentials, gifts, and books; canteenM, an open-plan, grab-and-go dining area open 24 hours; a rooftop bar, a 3rd-floor gym, and one-minute check in and out.

Hotel is first step in a bigger plan

The hotel’s design team commissioned a section of the entrance façade from Maria Molteni, an interdisciplinary artist and designer.

canteenM offers 24/7 food and beverage service.

The Boston hotel is within walking distance of Fenway Park, home to the Boston Red Sox baseball team. The hotel’s opening is part of the first stage of Lyrik, a mixed-use development that includes a 450,000-square-foot lab and office space housing the CarGurus Global Headquarters and The LEGO Group, the latter of which started moving employees into this space last spring. The development is also the first Boston-based outpost for the electirc carmaker Rivian. This fall, Pink Carrot and CHICHA San Chen will join Lyrik’s lineup. By spring 2025, Lyrik will have added George Howell Coffee, Van Leeuwen Ice Cream, and the Greek restaurant Avra Estiatorio.

The hotel's “Living Room" includes designated workspaces.

Related Stories

Market Data | Jul 28, 2021

Marriott has the largest construction pipeline of U.S. franchise companies in Q2‘21

472 new hotels with 59,034 rooms opened across the United States during the first half of 2021.

Market Data | Jul 26, 2021

U.S. construction pipeline continues along the road to recovery

During the first and second quarters of 2021, the U.S. opened 472 new hotels with 59,034 rooms.

Contractors | Jul 23, 2021

The aggressive growth of Salas O'Brien, with CEO Darin Anderson

Engineering firm Salas O'Brien has made multiple acquisitions over the past two years to achieve its Be Local Everywhere business model. In this exclusive interview for HorizonTV, BD+C's John Caulfield sits down with the firm's Chairman and CEO, Darin Anderson, to discuss its business model.

Hotel Facilities | Jul 20, 2021

A new Times Square hotel positions itself as a resort

Margaritaville Resort arrives as New York City considers creating entertainment districts.

Multifamily Housing | Jul 11, 2021

Aluminum railing systems offer ‘versatile styling, easy installation’

Trex Aluminum railing systems offer ‘versatile styling, easy installation,' says the manufacturer.

Daylighting Designs | Jul 9, 2021

New daylighting diffusers come in three shape options

Solatube introduces its newest technology innovation to its commercial product line, the OptiView Shaping Diffusers.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Hotel Facilities | Jun 18, 2021

Adaptive reuse for hospitality, with Frank Cretella of Landmark Developers

In an exclusive interview for HorizonTV, Landmark Developers' President Frank Cretella talks about the firm's adaptive reuse projects for the hospitality sector. Cretella outlines his company's keys to success in hospitality development, including finding unique properties and creating memorable spaces.

Hotel Facilities | May 26, 2021

Loisium Wine and Spa Resort expansion opens in Langenlois, Austria

Steven Holl Architects designed both the expansion and the original resort with associate architects Sam-Ott-Reinisch.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021