Design-build firm Clayco has launched an investment arm called Treehouse Adventures to provide financing and operational infrastructure to startups, including those serving the AEC industry.
“We see a lot of opportunities in construction services,” says Michael Latiner, who joined Clayco last November as Treehouse’s President and Principal.
The goal is to create an environment where fledgling companies can concentrate on innovation and worry less about running a business. Clayco has dedicated the 14th floor of its headquarters in Chicago to provide space for the startups.
Treehouse’s first investment is Chicago-based Ventana Design-Build Systems, a five-month-old company that designs, supplies, and installs high-performance glass curtain wall façade systems. Latiner says Ventana’s President, Bob Trainor (center in photo, flanked by VPs Marty Trainor, left, and Ryan Murphy), was known in the business and had the ideas and processes, but needed Clayco’s operational backbone for support. “We were able to get them up and running in a week,” says Latiner.
Trainor says that Treehouse uses Clayco’s back-office services to provide marketing, IT, legal, and accounting support. It also provides an experienced senior management team and a network of relationships that startups like Ventana can leverage.
Treehouse doesn’t have a dedicated fund set aside for investment, but Latiner says he anticipates investing in two or three companies a year. A second deal has already been cut, with a technology startup whose expertise is making buildings smarter.
Read about more innovations from BD+C's 2014 Great Solutions Report.
Related Stories
| Apr 8, 2014
Understanding value billing vs. conventional billing
Every company is a sum of the value it delivers to its clients. What differs from one company to the next is how that value is delivered and perceived. All too often, it is based solely on the fee you charge.
| Apr 8, 2014
Science, engineering find common ground on the Northeastern University campus [slideshow]
The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.
| Apr 8, 2014
40 Under 40 winners: Meet the contractors
Of the up-and-coming AEC professionals to be named to the class of 2014, nine make their living as contractors.
| Apr 7, 2014
40 Under 40 winners: Meet the architects
Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.
| Apr 4, 2014
$25 million Orion Jet Center designed by SchenkelShultz now open
As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe.
| Apr 3, 2014
Security, accountability, and cloud access: Can you really have it all?
I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally.
| Apr 2, 2014
The new model of healthcare facility management
A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Apr 1, 2014
The risks of mismatched fire-rated assemblies
Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team.