flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs

Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs

Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects.


By By BD+C Staff | February 15, 2012
This article first appeared in the April 2012 issue of BD+C.

The addition of air curtains in the International Green Construction Code (IgCC), the new comprehensive high performance green building code, promises energy and construction cost savings for commercial, industrial and institutional buildings.

Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects. However, many times specifications are blocked by local jurisdictions that have adopted the International Energy Construction Code (IECC), which doesn't yet sight air curtains as vestibule alternatives.

Thus, the newly-enacted IgCC, which is scheduled for March 2012 publishing, now provides an approved overlay of green construction products to the base code IECC, which is overseen by the International Code Council, the Washington-based organization responsible for providing minimum safety, sustainability and affordability building codes and standards.

Recent proposals to the IgCC by the Air Movement and Control Association International (AMCA), Arlington Heights, Ill., helped establish air curtains as a vestibule alternative with the stipulation that they're tested in accordance with ANSI/AMCA Standard 220-05, "Laboratory Methods of Testing Air Curtains for Aerodynamics Performance Ratings."

Also helpful in the code modification effort were recent studies proving air curtains as 10% more energy-efficient than vestibules. The three-month research study “Air Curtains: A Proven Alternative to Vestibule Design” used second-party validation from research/validation consultant, Blue Ridge Numerics, Charlottesville, Va., with certified results from proven computational fluid dynamics (CFD) analysis.

Besides energy savings, vestibules, especially in retail settings, consume anywhere from 25 to 250 square feet of usable retail space and carry construction costs ranging from $3,750 to $37,500, based on an average of $150/square feet construction costs.

Meanwhile air curtain proponents will continue to present energy efficiency data to code committees, in hopes of instituting the vestibule alternative measure into the IECC. The next meeting on the subject is scheduled in January 2013. 

Related Stories

| Nov 8, 2011

$11 million business incubator Florida Innovation Hub at the University of Florida completed by Charles Perry Partners, Inc.

The facility houses the UF Office of Technology Licensing, UF Tech Connect, other entities, and more than 30 startup technology tenants.

| Nov 8, 2011

Designer joins Holabird & Root

Clifton has been awarded numerous awards throughout her career, including two AIA Chicago Design Excellence Awards.

| Nov 4, 2011

Mortenson Construction builds its fifth wind facility In Illinois

Shady Oaks Wind Farm is under construction near Compton, Ill.

| Nov 4, 2011

CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?

ICC-ES currently references CSI's MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.

| Nov 4, 2011

McCarthy completes construction of South Region High School No. 2 in Los Angeles

Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.

| Nov 4, 2011

Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards

Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.

| Nov 3, 2011

GREC Architects announces opening of the Westin Abu Dhabi Golf Resort and Spa

The hotel was designed by GREC and an international team of consultants to enhance the offerings of the Abu Dhabi Golf Club without imposing upon the dramatic landscapes of the elite golf course.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Nov 3, 2011

2012 Pritzker Architecture Prize Ceremony to be held in China

The tradition of moving the event to world sites of architectural significance was established to emphasize that the prize is international, the laureates having been chosen from 16 different nations to date. 

| Nov 3, 2011

DMR Architects welcomes two new staff members

Siro Gonzalez joins the staff as junior graduate architect and Megan Byers joins the staff as marketing assistant.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021