Austin, Texas, adopts AI-driven building permit software
After a successful pilot program, Austin has adopted AI-driven building permit software to speed up the building permitting process.
HORIZONTV FEATURING BD+C: WATCH EPISODES ON DEMAND AT HORIZONTV
After a successful pilot program, Austin has adopted AI-driven building permit software to speed up the building permitting process.
Some California hospitals will have three additional years to comply with the state’s seismic retrofit mandate, after Gov. Gavin Newsom signed a bill extending the 2030 deadline.
The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown.Â
The construction of a building entails navigating through a maze of regulations, permits, and codes. Architects are more than mere designers; we are stewards of safety and navigators of code compliance.
The compilation ASTM Standards in Building Codes contains more than 1,300 ASTM construction specifications, practices and test methods, and is now available in DVD and online.
Starting in June, California’s latest version of its Title 24 building code kicks in, requiring several systems come with demand response capability.
A dormitory fire at the University of Nebraska at Omaha that displaced with 42 students (but caused no injuries) could trigger local building code changes.
The move will affect 24 districts that have schools inside Oklahoma City limits.
The city has been operating a downtown dirt parking lot in violation of its own code and the federal law for years.
In a nine to six vote, the North Carolina State Building Code Council on March 11 approved moving the commercial building code (except for the electrical code) to a six-year cycle for updating instead of a three-year cycle.
Two supervisors charged that a lack of adequate code enforcement has led to blight from dilapidated or unfinished buildings.Â
The issue was raised in the wake of a tragic fire at a seniors' residence in L'Isle-Verte.Â
State and city officials are pushing for increased bonding capacity to pay for the storm shelters.
Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.