flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Codes in Florida Panhandle made buildings vulnerable to Hurricane Michael

Codes and Standards

Codes in Florida Panhandle made buildings vulnerable to Hurricane Michael

Less stringent codes in northern parts of state linked to devastation


By Peter Fabris, Contributing Editor | October 23, 2018

Florida lawmakers and code policy officials have questioned the state’s approach to building codes in the wake of Hurricane Michael.

The Category 4 storm, with sustained winds of 155 mph, decimated coastal areas of the Florida Panhandle. Statewide codes have hurricane-resilient provisions, but they vary by region.

New office buildings and homes in Miami-Dade County must be designed to withstand winds around 175 mph. Along the stretch of the Panhandle hit hardest by Michael, though, the design standard varies from 120 mph to 150 mph.

In hard-hit Mexico Beach, some homes constructed under the latest code instituted in 2002 were destroyed. Code requirements have been based on storm history and the likelihood of future hurricanes striking a particular area. The Panhandle had seen few big storms since the 1800s, and Michael is the first known Category 4 hurricane to strike the region. Lawmakers and code officials now say codes may have to be strengthened in the northern part of the state.

Related Stories

| Jan 30, 2012

ZigBee and ISO 50001: Two new standards to make buildings greener

These developments demonstrate the dynamic nature of the market and the continued need for development of program standards of many different types that help builders and owners translate high performance and sustainable buildings goals into practical measures on the ground.

| Jan 30, 2012

New firm-fixed-price rules on federal contracts impact construction industry

Contractors will need to be on the lookout for policies such as the Contractor Accountability for Quality clause.

| Jan 30, 2012

Roofer’s fatal plunge demonstrates need for fall-prevention regulations

“The biggest problem is getting our workers to use the equipment,” says Michael J. Florio, executive director of the organization.

| Jan 26, 2012

Tampa moves to streamlined online permitting system

The system will replace an inefficient patchwork of old software and is designed to provide businesses, homeowners, and contractors with online access to permitting and licensing information.

| Jan 26, 2012

EPA to collect more data, seek comments before finalizing mud rule

The EPA says it will seek more data and is accepting comments until March 5.

| Jan 26, 2012

Industry challenges Connecticut's suit over defective construction work

The dispute arose over multimillion-dollar leaks at the University of Connecticut's law library.

| Jan 26, 2012

Earthquake 'fuse' could save buildings during temblors

The idea is to use an earthquake "fuse" that can prevent the tiny fractures and warps that make structures unsafe after a quake and very expensive to repair.

| Jan 26, 2012

HPD open materials standard for green building materials gains momentum

GreenWizard, provider of a cloud-based product management and project collaboration software, is the latest industry participant to sign on

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 18, 2012

Chile's seismic code upgrades credited with saving lives in 2010 quake

Since 1960, when Chile suffered a 9.5 magnitude quake, the largest ever recorded; the country has steadily improved building codes to protect lives and property.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021