flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cohen rejoins Deloitte’s capital projects practice

Cohen rejoins Deloitte’s capital projects practice

Cohen has more than 20 years of dispute resolution, project advisory, and risk management experience spanning a wide range of domestic and international engineering and construction projects.


By Posted by Tim Gregorski, Senior Editor | July 31, 2012
Mark W. Cohen
Mark W. Cohen
This article first appeared in the September 2012 issue of BD+C.

Deloitte has expanded its capital projects practice with the addition of Mark W. Cohen, who rejoins the organization as a director in Deloitte Financial Advisory Services LLP. Cohen will be based in New York.

Cohen has more than 20 years of dispute resolution, project advisory, and risk management experience spanning a wide range of domestic and international engineering and construction projects.

He has also presented expert witness testimony in international venues including American Arbitration Association, International Chamber of Commerce and United Nations Commission on International Trade Law arbitrations, as well as in U.S. Courts. He has provided independent internal arbitration and mediation services for owners, designers and contractors involved in various types of engineered and constructed projects. +

Related Stories

| Apr 5, 2013

Bangkok gets a leaning tower, that may topple

A seven-story apartment tower under construction in Bangkok has started to tilt and is on the verge of toppling.

| Apr 5, 2013

Snøhetta design creates groundbreaking high-tech library for NCSU

The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space.

| Apr 5, 2013

'My BIM journey' – 6 lessons from a BIM/VDC expert

Gensler's Jared Krieger offers important tips and advice for managing complex BIM/VDC-driven projects.

| Apr 3, 2013

AIA CES class: Sealant repairs that last – hybrid sealants for building restoration

It is hard to talk about restoration without talking about sustainability. This two-hour interactive online course discusses the role that restoration can and does play in the arena of sustainability, and specifically the role that sealants play in sustainable design and repair.

| Apr 3, 2013

5 award-winning modular buildings

The Modular Building Institute recently revealed the winners of its annual Awards of Distinction contest. There were 42 winners in all across six categories. Here are five projects that caught our eye.

| Apr 2, 2013

6 lobby design tips

If you do hotels, schools, student unions, office buildings, performing arts centers, transportation facilities, or any structure with a lobby, here are six principles from healthcare lobby design that make for happier users—and more satisfied owners.

| Apr 2, 2013

4 hospital lobbies provide a healthy perspective

A carefully considered entry zone can put patients at ease while sending a powerful branding message for your healthcare client. Our experts show how to do it through four project case studies.

| Apr 2, 2013

Green building consultant explores the truth about green building performance in new book

A new book from leading sustainability, green building author and expert Jerry Yudelson challenges assumptions about the value of sustainable design and environmentally-friendly buildings.

| Apr 1, 2013

Half of building owners use 'smart' technologies, says survey

A survey of 291 building owners by IDC Energy Insights shows that 50% of owners use smart building technologies, such as HVAC controls, lighting controls, and analytics/data management.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021