flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The College of the Holy Cross completes a $110 million performing arts center

The College of the Holy Cross completes a $110 million performing arts center

Near Boston, the 84,000-square-foot facility includes a 400-seat concert hall and proscenium theater and a 200-seat flexible space.


By Novid Parsi, Contributing Editor | October 3, 2022
Prior Performing Arts Center ext
Courtesy DILLER SCOFIDIO + RENFRO.

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center. Designed by Diller Scofidio + Renfro (DS+R), the 84,000-square-foot facility serves as an incubator for multidisciplinary learning and creativity, with venues for both fine arts and performing arts. The PAC will support creative collaboration among faculty and students across all academic disciplines.

Among the PAC’s key features, the Beehive is a flexible space that includes a shared multimedia teaching area for electronic music and musical composition courses, sound recording, sound editing, and video and film editing. The Beehive also provides collaborative workspaces, multipurpose rehearsal spaces, a cafe, and gathering spaces with movable furniture.

The Luth Concert Hall, a 400-seat convertible concert hall and proscenium theater, serves as the College’s principal venue for symphonic music, chamber music, jazz, gamelan, and opera, as well as musical theater and dance. The Boroughs Theatre is a 200-seat, fully flexible experimental theater space. And the Cantor Art Gallery offers a variety of interdisciplinary exhibits and increased exhibition and storage space.

Support spaces include a scene shop, costume design studio, recording studio, lighting and set design study, and multi-use spaces to encourage collaboration among the arts and between the arts and other disciplines. Outdoor amenities include a small amphitheater, an outdoor teaching area and workspace, a meditative garden, and a sculpture garden. 

Major inaugural performances at the PAC will take place in December, including the world premiere of a new violin concerto composed by a College of the Holy Cross professor.

On the Building Team:
Owner: College of the Holy Cross
Executive architect: Perry Dean Rogers
Landscape architect: OLIN
Civil engineer: Nitsch Engineering
MEP engineer: Altieri Sebor Wieber
Structural engineer: Robert Silman Associates

Prior PAC ext 2
Courtesy Iwan Baan.
Prior PAC int
Courtesy Iwan Baan.
Prior PAC theater
Courtesy Iwan Baan.
Prior PAC int 3
Courtesy Iwan Baan.
Prior PAC int 4
Courtesy Iwan Baan.
Prior PAC int 5
Courtesy Brett Beyer.
PAC Prior int 6
Courtesy Brett Beyer.
Prior PAC theater int 7
Courtesy Brett Beyer.

 

Related Stories

| Apr 11, 2014

First look: KPF's designs for DreamWorks in the massive Shanghai DreamCenter

Two blocks of offices will be centerpiece of new cultural and lifestyle district in the West Bund Media Port.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Apr 1, 2014

Hawaiian performing arts center named nation's best new theater

Seabury Hall Creative Arts Center, a prep-school performing arts center on Maui in Hawaii, received the United States Institute for Theatre Technology's (USITT) highest architecture award—the Honor Award. 

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 13, 2014

Do you really 'always turn right'?

The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.” 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Mar 7, 2014

Chicago's 7 most threatened buildings: Guyon Hotel, Jeffrey Theater make the list

The 2014 edition of Preservation Chicago's annual Chicago's 7 list includes an L station house, public school, theater, manufacturing district, power house, and hotel.

| Mar 5, 2014

5 tile design trends for 2014

Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021