flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Colorado School of Mines CoorsTek Center opens

University Buildings

The Colorado School of Mines CoorsTek Center opens

Bohlin Cywinski Jackson designed the building.


By David Malone, Associate Editor | January 29, 2019
CoorsTek Center at dusk

Photo: Nic Lehoux

The CoorsTek Center, a four-story education and research facility on the Colorado School of Mines campus, has officially been completed.

The Center supports a range of academic and research activities and is the new home for the College of Applied Science and Engineering (CASE) and the Department of Physics. A metal and glass facade is vertically punctuated by service cores clad in dark masonry that help to anchor the building’s entrances. The building’s northwest exterior, which fronts the campus’s Kafadar Commons, comprises full-height glazing at Level 1, and vertical glass panels and metal fins at Levels 2 and 3 that float above and modulate as influenced by the building’s interior program.

In addition to the CASE classrooms, the CoorsTek Center also includes general classroom space such as media-intensive “Active Learning” rooms that are flexible and can be rearranged for group work and discussions. A promenade on Level 1 incorporates seating and collaborative work areas that emulate tech workplaces to prepare students for post-college work life.

 

See Also: Suffolk breaks ground on large housing/dining complex for UMass Dartmouth

 

While Level 1 is available for the entire campus, Levels 2 and 3 contain dedicated teaching and research laboratories and faculty and graduate student offices. Below grade are additional lab spaces with specific lighting, sound, or vibration requirements.

Bohlin Cywinski Jackson designed the building in association with Anderson Mason Dale Architects.

Related Stories

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

University Buildings | May 17, 2021

Carolina Gaming Arena completes at UNC Chapel Hill

Clark Nexsen designed the project.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

University Buildings | May 13, 2021

Education Building II at UC Riverside receives final approval

Hensel Phelps + CO Architects will be the design-build team for the project.

Healthcare Facilities | May 5, 2021

HOK to design new Waterloo Eye Institute

The project is being designed for The University of Waterloo’s School of Optometry & Vision Science.

University Buildings | May 4, 2021

UMass Medical School’s new Education and Research Building

ZGF and ARC/Architectural Resources Cambridge are designing the project.

University Buildings | Apr 29, 2021

Perkins&Will to design new gateway building for the University of British Columbia

The building will transform the arrival experience for students, staff, and visitors.

University Buildings | Apr 29, 2021

The Weekly Show, April 29, 2021: COVID-19's impact on campus planning, and bird management strategies

This week on The Weekly show, BD+C Senior Editor John Caulfield interviews a duo of industry experts on 1) how campus planning has changed during the pandemic and 2) managing bird infestations on construction sites and completed buildings.

University Buildings | Apr 19, 2021

Duke University’s Wilkinson Building completes

Bohlin Cywinski Jackson designed the project.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021