flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Congressmen ask Biden to tackle rising lumber costs

Codes and Standards

Congressmen ask Biden to tackle rising lumber costs

Rising materials costs and supply shortages threaten economic recovery, housing starts.


By Peter Fabris, Contributing Editor | March 18, 2021

Courtesy Pixabay

Representatives Jim Costa (D-California) and Jodey Arrington (R-Texas) sent a letter to President Joe Biden asking him to intervene to curb rising lumber costs.

The congressmen’s letter asserts that rising building materials costs and supply shortages could harm the economic recovery and exacerbate an already constrained housing market. “Unfortunately, this unprecedented price increase on new homeowners, as well as home builders, will persist until new sawmills come online and current mills re-open and operate at full capacity,” the letter says.

The National Association of Home Builders also supports administrative action. Lumber costs have tripled since April 2020, NAHB says, increasing the cost of construction on a typical single-family home by $24,000.

NAHB has asked the Commerce Department to investigate the issue. The organization has noted the low levels of lumber production and sawmill output despite the high demand for product. NAHB chairman Chuck Fowke has urged Biden and Congress to encourage domestic lumber producers to ramp up production and end tariffs on Canadian lumber shipments.

Related Stories

Codes and Standards | Jul 22, 2020

New version of IAPMO’s Water Demand Calculator is available

Enhanced features include selection between single- and multifamily buildings.

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

Codes and Standards | Jul 22, 2020

Architecture billings remain in negative territory, begin to stabilize

Fewer architecture firms report declining billings this month.

Codes and Standards | Jul 20, 2020

N.Y. construction firm to pay $1.5 million to settle sexual harassment claim

Managers said to demand sex for pay and OT opportunities.

Codes and Standards | Jul 16, 2020

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.

Codes and Standards | Jul 15, 2020

Georgia gives the go-ahead for tall mass timber construction

Standards review scheduled to be completed by July 2021.

Codes and Standards | Jul 15, 2020

Softwood-lumber duties boost expenses amid COVID-19 outbreak

Little hope this year for resolution of trade dispute with Canada.

Codes and Standards | Jul 14, 2020

Metal Construction Assn. releases three EPD updates

Pertain to Metal Composite Materials, Insulated Metal Panels, and Roll Formed Aluminum and Steel Cladding.

Codes and Standards | Jul 13, 2020

5 must reads for the AEC industry today: July 13, 2020

4 technologies for improving building sanitation and tech's ever-evolving impact on the multifamily space.

Codes and Standards | Jul 9, 2020

Funding opportunity for field validation of high-impact building technologies

Dept. of Energy program targets dynamic interactions with electric grid.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021