flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The construction of the Atlanta Braves’ new stadium, in 1 minute

Sports and Recreational Facilities

The construction of the Atlanta Braves’ new stadium, in 1 minute

OxBlue’s time-lapse video draws from more than 200,000 images.


By John Caulfield, Senior Editor | March 9, 2017

SunTrust Park in Atlanta is racing toward its final stages of construction to be able to open on time for opening day for the Atlanta Braves' MLB baseball team. A newly released time-lapse video captures the last 21 months of construction in a flash. Image: hshin.ajc.com 

The opening of SunTrust Park, the Atlanta Braves’ new $622 million, 41,500-seat stadium, is only 35 days away from opening day of the Major League Baseball season.

The stadium, designed by Populous and being built by American Builders, had its official groundbreaking on September 16, 2014. Since May 2015, OxBlue Corp., a construction camera provider, has been documenting the construction of the stadium and its plaza, known as The Battery Atlanta, using one fixed-position and two pan-tilt-zoom cameras that were mounted outside and above the stadium. Three other cameras were mounted at different locations on the 15-acre jobsite.

OxBlue has released a 1 minute-6 second video that compresses 21 months of construction. It was produced using a selection of 203,616 images captured by the three cameras.

SunTrust Park will include the first full LED lighting system in a major league stadium, and a canopy that shades about 60% of its seats from the sun.

Click here as well to take a 360-degree tour of the stadium. (You can move the image to see different parts of the park.)

 

Related Stories

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 7, 2013

Fitness center design: What do higher-ed students want?

Campus fitness centers are taking their place alongside student centers, science centers, and libraries as hallmark components of a student-life experience. Here are some tips for identifying the ideal design features for your next higher-ed fitness center project. 

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 28, 2013

Urban growth doesn’t have to destroy nature—it can work with it

Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

| Oct 8, 2013

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior.

| Oct 1, 2013

13 structural steel buildings that dazzle

The Barclays Center arena in Brooklyn and the NASCAR Hall of Fame in Charlotte, N.C., are among projects named 2013 IDEAS2 winners by the American Institute of Steel Construction.

| Sep 26, 2013

6 ways to maximize home-field advantage in sports venue design

Home-field advantage can play a significant role in game outcomes. Here are ways AEC firms can help create the conditions that draw big crowds, energize the home team to perform better, and disrupt visiting players.

| Sep 24, 2013

8 grand green roofs (and walls)

A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021