flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction bidding activity ticks up in February

Contractors

Construction bidding activity ticks up in February

The Blue Book Network's Velocity Index measures month-to-month changes in bidding activity among construction firms across five building sectors and in all 50 states. 


By Blue Book Building & Construction Network | April 9, 2021
Construction bidding activity ticks up in February

Photo: Pixabay

   

The Blue Book Network Velocity Index ticked up 0.5% to 100.9 in February from a revised 100.5 in January (December 2018 = 100). This the most stable the Index has been since before the pandemic began. 

The Blue Book Network Velocity Index is a measure of month-to-month changes in bidding activity in The Blue Book Network, accounting for seasonality, providing a leading indicator of construction spending to inform critical decision making.  

 

 

Analysis by building sector shows that the manufacturing, institutional, and multifamily categories fell back slightly, but were offset by gains in commercial and lodging. Lodging jumped nearly 50% to 69.4 following a 44% increase from December to January.

Some highlights:
• The institutional building sector dipped 2.5% to 117.2, but showed strengthening in the Midwestern states
• The manufacturing sector was mostly unchanged, with Pennsylvania, Massachusetts, Virginia, Washington, and Louisiana gaining
• The commercial buildings sector climbed 3.6% to 75.1
• Lodging continued its two-month recovery with strong gains mostly in the Sun Belt
• Multifamily, while down slightly, remained strong at 118.8, bolstered by Midwest and Southeast states
• States split the difference in February, with 22 on the rise
• Midwest states held the line with most showing moderate increases
• Larger states losing ground included California, Florida, New York, and Texas, with modest declines.

More on the The Blue Book Network Velocity Index.

 

Related Stories

| Sep 13, 2010

Campus housing fosters community connection

A 600,000-sf complex on the University of Washington's Seattle campus will include four residence halls for 1,650 students and a 100-seat cafe, 8,000-sf grocery store, and conference center with 200-seat auditorium for both student and community use.

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

| Sep 13, 2010

Committed to the Core

How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.

| Sep 13, 2010

Conquering a Mountain of Construction Challenges

Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021