flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction industry could be hurt by non-renewal of terrorism insurance bill

Construction industry could be hurt by non-renewal of terrorism insurance bill

Despite broad support, measure stalled in Senate


By Peter Fabris, Contributing Editor | January 8, 2015
Photo: Abderitestatos via Wikimedia Commons
Photo: Abderitestatos via Wikimedia Commons

The construction industry and real estate development could be hampered by the U.S. Congress’s failure to renew the Terrorism Risk Insurance Act (TRIA).

Insurance industry experts say without federal terrorism reinsurance in place for 2015, resulting canceled property/casualty insurance coverage and market chaos could be disruptive to the economy.

"A major terrorist attack occurring without a TRIA law on the books will be far more disruptive to the U.S. economy than one where TRIA is in place," saidInsurance Information Institute President Robert Hartwig. “Terrorism insurance policies are going to lapse in 2015, and insurers will be under no obligation to renew them, adversely impacting the construction, energy, and real estate industries, among others.”

Federal terrorism reinsurance had helped stabilize the market in the wake of the Sept. 11, 2011 terrorist attacks, and it had been renewed several times since. There was widespread bipartisan support for TRIA renewal, but retiring U.S. Sen. Tom Coburn, an Oklahoma Republican, held up passage. Coburn objected to a measure included in the bill that would have set up the National Association of Registered Agents and Brokers, an entity that would have potentially bypassed state regulators.

One positive sign: A.M. Best said it “has determined that no rating actions on insurers previously identified as over-reliant upon [TRIA] are necessary at this time.” The rating agency said it reviewed action plans from insurance carriers addressing what they would do if TRIA was not renewed and concluded that “sufficient mitigation initiatives were developed to avoid a material impact on a rating unit’s financial strength.”

(http://www.insurancejournal.com/news/national/2014/12/18/350561.htm)

Related Stories

| Mar 19, 2014

Santa Monica, Calif., may offer LEED alternatives to help promote green construction

With developers in Santa Monica, Calif., looking for ways to build green more inexpensively, the city may consider alternatives to LEED such as Green Globes.

| Mar 18, 2014

Canadian wood industry pushes for ‘wood first’ legislation on mid-rise public projects

The wood lobby is pushing Canadian provinces to pass “wood first” legislation specifying wood framed structures as the default for mid-rise public works projects where warranted.

| Mar 13, 2014

USGBC hits back at Environmental Policy Alliance criticism

The Washington, D.C.-based Environmental Policy Alliance has launched a campaign to make the claim that LEED-certified buildings are less energy efficient than other buildings. In response, USGBC told its members: "Don’t be fooled, the Environmental Policy Alliance isn’t the 'EPA' you might think."

| Mar 13, 2014

North Carolina board recommends switch to six-year code update cycle

In a nine to six vote, the North Carolina State Building Code Council on March 11 approved moving the commercial building code (except for the electrical code) to a six-year cycle for updating instead of a three-year cycle.

| Mar 13, 2014

OSHA’s funding disclosure requirement for those offering silica rule comments draws ire

The Occupational Safety and Health Administration is requiring those who submit comments on the silica rule to disclose their funding sources for their scientific research to avoid conflict of interest.

| Mar 13, 2014

EPA publishes ‘best management practices’ rule on erosion, stormwater at construction sites

The Environmental Protection Agency published a new rule this month that will require the construction, housing, and utility sectors to carry out "best management practices" in order to prevent erosion and harmful stormwater discharges at construction sites.

| Mar 5, 2014

San Francisco board seeks remedies to code enforcement complaints

Two supervisors charged that a lack of adequate code enforcement has led to blight from dilapidated or unfinished buildings. 

| Mar 5, 2014

Obama proposes $1 billion for climate change risk mitigation

President Barack Obama would spend $1 billion to “better understand the projected impacts of climate change,” encourage local action to reduce future risk, and fund technology and infrastructure that will be more resilient to climate change.

| Mar 5, 2014

Southern Forest Products Assn. revamps pressure-treated pine specifications

It provides information to assist with the proper specification and use of pressure-treated Southern Pine materials. 

| Mar 5, 2014

UL, PRI Construction Materials Technologies reach product certification agreement

Underwriters Laboratories (UL) Inc. reached an agreement with PRI Construction Materials Technologies LLC (PRI) through which PRI will participate in UL's "Data Acceptance Program," enabling the acceptance of data generated at PRI toward UL product certification.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021