flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction industry skills shortage is contributing to project delays

Contractors

Construction industry skills shortage is contributing to project delays

Higher costs also hampering progress on project timelines


By Peter Fabris, Contributing Editor | September 11, 2023
Image by PIRO from Pixabay
Image by PIRO from Pixabay

Relatively few candidates looking for work in the construction industry have the necessary skills to do the job well, according to a survey of construction industry managers by the Associated General Contractors of America (AGC) and Autodesk.

It’s a frustrating and business-impacting situation for many of the 1,400 U.S. construction firms that responded to a questionnaire in July and August. About 85% of survey respondents said they are trying to fill openings, but the going is rough.

Supply chain issues and workforce challenges are ongoing concerns. A whopping 68% of respondents said that applicants lack the skills needed to work in construction. Some 61% reported project delays due to labor shortages, and 65% reported delays because of supply challenges. Higher costs caused half the respondents to cancel, postpone, or scale back projects.

In response to the skills shortage, firms are investing more in internal training, with 41% boosting spending in this area. One-quarter of respondents say they are using video training, and 14% have turned to augmented and virtual reality technology for training.

There is some optimism reflected in the survey. A sizeable minority of construction firms responding to the survey are hopeful that new technology will improve the workforce skills outlook. About 41% of respondents said that AI and robotics in the next five years will improve the quality of construction jobs and make workers safer and more productive.

Related Stories

| Aug 11, 2010

CHPS debuts high-performance building products database

The Collaborative for High Performance Schools (CHPS) made a new tool available to product manufacturers to help customers identify building products that contribute to sustainable, healthy, built environments. The tool is an online, searchable database where manufacturers can list products that have met certain environmental or health standards ranging from recycled content to materials that contribute to improved indoor air quality.

| Aug 11, 2010

ICC launches green construction code initiative for commercial buildings

The International Code Council has launched its International Green Construction Code (IGCC) initiative, which will aim to reduce energy usage and the carbon footprint of commercial buildings.Entitled “IGCC: Safe and Sustainable By the Book,” the initiative is committed to develop a model code focused on new and existing commercial buildings. It will focus on building design and performance.

| Aug 11, 2010

Green Building Initiative launches two certification programs for green building professionals

The Green Building Initiative® (GBI), one of the nation’s leading green building organizations and exclusive provider of the Green Globes green building certification in the United States, today announced the availability of two new personnel certification programs for green building practitioners: Green Globes Professional (GGP) and Green Globes Assessor (GGA).

| Aug 11, 2010

Construction employment declines in 49 states & D.C. in September compared to last year

Construction employment again declined in large numbers in all but one state this September compared to last year according to an analysis of new state-by-state employment figures released today by the federal government.

| Aug 11, 2010

Gilbane, Manhattan Construction top BD+C's ranking of the nation's 50 largest K-12 school contractors

A ranking of the Top 50 K-12 School Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

29 Great Solutions for the AEC Industry

AEC firms are hotbeds of invention and innovation to meet client needs in today's highly competitive environment. The editors of Building Design+Construction are pleased to present 29 "Great Solutions" to some of the most complex problems and issues facing Building Teams today. Our solutions cover eight key areas: Design, BIM + IT, Collaboration, Healthcare, Products, Technology, Business Management, and Green Building.

| Aug 11, 2010

International Living Building Institute established to advance 'living buildings'

The idea of a Living Building, a high-performance building that produces its own power and cleans and reuses all of its water, is gaining momentum around the world.  In an effort to oversee the global development of Living Buildings, the International Living Building Institute (ILBI) has been established. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021