flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction industry task force aims for standardized carbon reporting

Contractors

Construction industry task force aims for standardized carbon reporting

The task force will produce a guidebook to help contractors understand how to calculate and report emissions.


By Peter Fabris, Contributing Editor | June 30, 2023
Image by Hands off my tags! Michael Gaida from Pixabay
Image by Hands off my tags! Michael Gaida from Pixabay

A newly formed Associated General Contractors of America (AGC) task force on decarbonization and carbon reporting will address the challenges around reporting and reducing carbon emissions in the construction industry.

The group aims to standardize carbon reporting by developing an industry guidebook and educational resources on decarbonization best practices. The task force is part of AGC’s climate change initiative, which aims to shape climate change policies that impact the construction industry, while reducing the industry’s environmental impact.

The initiative’s founding members include Skanska, Clark, DPR, and Ryan Companies. Additional members now include Granite, Kiewit, Mortenson, and Turner.

“The committee will develop a guidebook to help contractors understand how to calculate and report emissions, and how to set actionable goals as they play an instrumental role in addressing climate change,” says Myrrh Caplan, national vice president of sustainability at Skanska USA Building and chair of the AGC Task Force on Decarbonization and Carbon Reporting. “We look forward to being part of a process that reduces the industry’s environmental impact and creates more resilient communities.”

Related Stories

| Jan 16, 2015

Artsy lifeguard stations will brighten Toronto’s snowy beach

Five winning designs have been unveiled for lifeguard stands that will double as public space art installations on Toronto's beach.

| Jan 16, 2015

New York City construction costs continue to climb

A study released by the New York Building Congress shows that construction costs in Manhattan have risen 5% in each of the last two years.

| Jan 15, 2015

A reconstructed Taliesin West is the largest Frank Lloyd Wright LEGO Model [slideshow]

Artist Adam Reed Tucker used 180,000 LEGO pieces and 420 hours of work to recreate Frank Lloyd Wright's Taliesin West campus.

| Jan 15, 2015

Construction materials prices fall in November

Construction input prices dipped 1.4% during the final month of 2014 and are down nearly 1% on a year-over-year basis, according to the Jan. 15 producer price index release from the U.S. Department of Labor. 

| Jan 15, 2015

Libeskind unveils 'zig zag' plan for recreational center near Vilnius ski area

Perched on the highest peak between Vilnius' historic quarter and downtown, the Vilnius Beacon will be a hub for visiting skiers and outdoor enthusiasts.

| Jan 14, 2015

10 change management practices that can ease workplace moves

No matter the level of complexity, workplace change can be a challenge for your client's employees. VOA's Angie Lee breaks down the process of moving offices as efficiently as possible, from creating a "change team" to hosting hard-hat tours.

| Jan 13, 2015

Steven Holl unveils design for $450 million redevelopment of Houston's Museum of Fine Arts

Holl designed the campus’ north side to be a pedestrian-centered cultural hub on a lively landscape with ample underground parking. 

| Jan 9, 2015

Santiago Calatrava talks with BBC about St. Nicholas Church on Ground Zero

Calatrava reveals that he wanted to retain the “tiny home” feel of the original church building that was destroyed with the twin towers on 9/11.

| Jan 9, 2015

Nonresidential construction hiring surges in December 2014

The U.S. construction industry added 48,000 jobs in December, including 22,800 jobs in nonresidential construction, according to the Bureau of Labor Statistics preliminary estimate released Jan. 9. 

| Jan 9, 2015

10 surprising lessons Perkins+Will has learned about workplace projects

P+W's Janice Barnes shares some of most unexpected lessons from her firm's work on office design projects, including the importance of post-occupancy evaluations and having a cohesive transition strategy for workers.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021