flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia

Mace, EC Harris will oversee building of 1,000-meter, $1.2 billion Kingdom Tower.


By BD+C Staff | February 21, 2013
At more than 1 km, Kingdom Tower will be the world's tallest building.
At more than 1 km, Kingdom Tower will be the world's tallest building.

A joint venture consisting of Mace and consultant EC Harris will oversee the construction of Kingdom Tower: a 1,000-meter project proposed as the tallest building in the world. Saudi firm Binladen Group will build the skyscraper, which will be three to four times as tall as London's Shard, another Mace/Harris project. An interdisciplinary team led by Adrian Smith + Gordon Gill Architecture designed the 500,000-square-meter project, which will combine a luxury hotel, apartments, office space, and an observatory.

The Harris/Mace joint venture incorporates the tall-buildings expertise of EC Harris and RISE, a sister firm within ARCADIS, and Mace, an international company. Together the firms have delivered more than 100 tall buildings worldwide. Construction is projected to begin later this year and take more than five years.

The tower is planned as the centerpiece of the Kingdom City development, a project of the Jeddah Economic Company. The design for the urban project will include residential, commercial, hotel, offices, retail, educational, and commercial properties. 

(http://www.echarris.com/reference/news/kingdom_tower.aspx)

(Gizmodo image via Construction Enquirer)

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021