Created from custom-designed mixes of decorative concrete, the hardscape outside of the Boston Bruins new Warrior Ice Arena and Practice Facility is both aesthetically pleasing and sustainable. The concrete contains unique colors, aggregates, and textures, as well as treatments to reduce the urban heat island effect, to achieve the desired look, while also meeting the project’s LEED certification goals.
The project team worked with Aggregate Industries to develop the special mix using the company’s Artevia Color and Artevia Exposed decorative concrete products in white and gray, with a highly reflective coloring admixture from L.M. Scofield.
The Artevia Color concrete, with onyx black and custom gray alternating strips, was placed at street level. The Artevia Exposed concrete, with colored stones and glass, was used for the elevated courtyard.
The most unusual aspect of the hardscape is a 68-foot-high hockey stick surrounded by concrete pucks and large, sweeping patterns in the concrete to resemble skate marks on ice, at the arena’s main entrance.
Related Stories
| Apr 10, 2012
Structured Development & Bucksbaum close on new retail site in Chicago
The site is the location of New City, a mixed-use development that will feature 370,000-sf of retail space and 280 residential rental units.
| Apr 4, 2012
Educational facilities see long-term benefits of fiber cement cladding
Illumination panels made for a trouble-free, quick installation at a cost-effective price.
| Apr 3, 2012
Suffolk completes phase one of Baystate Medical Center expansion
Construction management firm awarded emergency department project for successful build of $296 million MassMutual Wing and Davis Family Heart and Vascular Center.
| Apr 3, 2012
Educational facilities see long-term benefits of fiber cement cladding
Illumination Series panels made for a trouble-free, quick installation at a cost-effective price. The design for Red Hawk Elementary School stems from the desire to create a vibrant place for kids to learn. In an effort to achieve this design, RB+B Architects selected Nichiha USA to provide a durable yet modern, contemporary exterior finish.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Mar 28, 2012
Meridian Design Build Begins work on 38 acre redevelopment project
The project includes construction of a new 150,585-sf cross dock facility that will include full service truck maintenance and repair bays, a truck wash, and approximately 20,000-sf of corporate office space.
| Mar 27, 2012
Precast concrete used for affordable, sustainable housing in New York
Largest affordable housing development in the nation will provide housing for close to 500,000 people.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.