flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Codes and Standards

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Campus plans include photovoltaic arrays and geothermal ground source heat pumps.


By Peter Fabris, Contributing Editor | June 15, 2017

Pixabay Public Domain

Cornell Tech, under construction on Roosevelt Island in New York City, recently announced details of its plan to achieve Net Zero energy efficiency for The Bloomberg Center.

Designed by the architecture firm Morphosis, The Bloomberg Center is the first academic building to be constructed on the Cornell Tech campus. The first phase of this development will open this September.

The campus plans include photovoltaic arrays, geothermal ground source heat pumps, an energy-efficient facade balancing the ratio between transparency and opaqueness to maximize building insulation and decrease energy demand, and smart building features that will monitor lighting and plug load use. The strategy to achieve a low energy building is through a stepped approach, prioritizing reduction in energy demand through load reductions and maximizing passive and energy efficient design, as well as using renewable energy to power the building systems.

There are 80 closed-loop geothermal wells, each 400 feet deep, that were drilled below the main campus public open space. The ground-source heat pumps will be used with an active chilled-beam system.

An acre-sized photovoltaic array tops The Bloomberg Center and neighboring The Bridge building. The building designs incorporate the panels as an integral architectural feature. The array on The Bloomberg Center also provides building shading.

Related Stories

Codes and Standards | Sep 8, 2017

Los Angeles luxury high-rise is first U.S. apartment building to achieve WELL Multifamily certification

Hollywood Proper Residences have verified indoor air and water quality features.

Codes and Standards | Sep 7, 2017

More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone

Properties outside of these zones are not required to carry flood insurance.

Codes and Standards | Sep 6, 2017

Seventy percent of contractors have trouble finding workers

AGC survey indicates that fewer companies may be able to bid on projects.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Codes and Standards | Sep 1, 2017

U.S. markets with the largest hotel construction pipeline

New York has the largest hotel construction pipeline of any U.S. market.

Codes and Standards | Aug 30, 2017

Trump rescinds elevation requirements for federally funded buildings and infrastructure

Flood protection on subsidized housing, hospitals, and other public buildings rolled back.

Codes and Standards | Aug 30, 2017

Stormwater runoff mitigation pays off for some building owners

Rain gardens, green roofs, cisterns, and rainwater recycling add value.

Codes and Standards | Aug 28, 2017

Commercial properties address state carbon-reduction policies

EV charging stations, batteries, and microgrid technology are all part of effort to meet demand for cleaner power.

Codes and Standards | Aug 24, 2017

OSHA silica dust exposure enforcement begins Sept. 23

Vacuum dust collection, water-delivery systems, and respirators will be required.

Codes and Standards | Aug 18, 2017

Cool roofs may increase air pollution

California’s requirement for cool roofs on new non-residential buildings could promote smog.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021