flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Codes and Standards

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Campus plans include photovoltaic arrays and geothermal ground source heat pumps.


By Peter Fabris, Contributing Editor | June 15, 2017

Pixabay Public Domain

Cornell Tech, under construction on Roosevelt Island in New York City, recently announced details of its plan to achieve Net Zero energy efficiency for The Bloomberg Center.

Designed by the architecture firm Morphosis, The Bloomberg Center is the first academic building to be constructed on the Cornell Tech campus. The first phase of this development will open this September.

The campus plans include photovoltaic arrays, geothermal ground source heat pumps, an energy-efficient facade balancing the ratio between transparency and opaqueness to maximize building insulation and decrease energy demand, and smart building features that will monitor lighting and plug load use. The strategy to achieve a low energy building is through a stepped approach, prioritizing reduction in energy demand through load reductions and maximizing passive and energy efficient design, as well as using renewable energy to power the building systems.

There are 80 closed-loop geothermal wells, each 400 feet deep, that were drilled below the main campus public open space. The ground-source heat pumps will be used with an active chilled-beam system.

An acre-sized photovoltaic array tops The Bloomberg Center and neighboring The Bridge building. The building designs incorporate the panels as an integral architectural feature. The array on The Bloomberg Center also provides building shading.

Related Stories

Codes and Standards | Jan 4, 2022

Architects at New York firm take steps to unionize

Support for unionization reported at two other New York firms.

Codes and Standards | Jan 3, 2022

Biden’s executive order for a carbon-neutral government includes green materials mandate

As a driver of demand, federal procurement impact could ripple through the economy.

Codes and Standards | Jan 3, 2022

Controversial California solar power incentive proposal would reduce subsidies

Plan intended to encourage customers to install power storage systems.

Codes and Standards | Jan 3, 2022

New York City bans new gas hookups

Applies to gas stoves, boilers, and heaters in new buildings and buildings that undergo gut renovations.

Codes and Standards | Jan 3, 2022

New engineering guide on fire safety for very tall buildings released

Topics include emergency egress, fire resistance, building envelope, suppression, detection, alarms, and smoke control.

Codes and Standards | Dec 22, 2021

Updated ASCE 7-22 standard includes first-ever criteria for tornado-resistant design

New document provides up-to-date, coordinated loading provisions for general structural design.

Codes and Standards | Dec 21, 2021

Outdated and redundant building codes plague St. Louis area development

Region’s combined codes nearly double the length of the IRS Code.

Digital Twin | Dec 20, 2021

Groups ally to advance augmented reality and digital twin technology

AREA and Digital Twin Consortium to work on improving how technology components interoperate.

Codes and Standards | Dec 20, 2021

Tension rises in California over state’s push to build more housing

Attorney general hints at lawsuits against cities that don’t comply with zoning reform.

Codes and Standards | Dec 17, 2021

Tension rises in California over state’s push to build more housing

Attorney general hints at lawsuits against cities that don’t comply with zoning reform.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021