flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 affects the industry’s adoption of ConTech in different ways

AEC Tech

COVID-19 affects the industry’s adoption of ConTech in different ways

A new JLL report assesses which tech options got a pandemic “boost.”


By John Caulfield, Senior Editor | December 8, 2020
Production of Katerra's new window line, made at its facility in Tracy, Calif.

Last September, Katerra, which specializes in modular solutions, launched its high-performance Kova Windows line, produced in its Tracy, Calif., facility. JLL found that the COVID-19 pandemic hasn’t had much impact on the industry’s adoption of modular construction. Image: Katerra  

The novel coronavirus pandemic has reshaped the construction industry, mostly positively in terms of operational efficiency and worker safety. It has also accelerated the growth—and funding for—construction technology, while creating a hierarchy for how broadly the industry has adopted these tools.

In its latest “State of Construction tech” report, released today, JLL aims to organize the wide range of technology options and measure how the pandemic has impacted their application by AEC firms and the clients on their projects.

Henry D’Esposito, JLL’s Construction Research Senior Analyst and the report’s author, asserts that, due to the pandemic, “three years of construction technology growth and adoption have been compressed into the past nine months.” Venture capital has continued to flow to startups, with funding levels about on par with the average for the past five years.

Construction tech kept jobsites open and projects running. It also allowed AEC firms whose employees were forced to work remotely to maintain their workflows. According to a recent U.S. Chamber of Commerce survey, 67% of the construction firms polled allowed employees to work from home. However, JLL notes that smaller firms were less likely to have systems in place.

Construction firms in general with fewer discretionary dollars were likelier to select proven tech solutions rather than take a risk on a less-mature startup.

 

WEARABLES IMPROVE WORKER SAFETY

ConTech enabled onsite execution in two ways, JLL observes: First, by creating opportunities to have fewer people on a jobsite. Second, by keeping anyone who is essential to being onsite as safe as possible.

“Technology solutions that have expanded this year include wearables and monitoring devices to ensure workers stay socially distanced and to allow contact tracing if any issues arise; and planning tools to enable optimal efficiency in staging and scheduling to ensure that teams stay separated,” says JLL.

Wearables were among the ConTech tools for which the impact of the pandemic on their usage was deemed “high” by JLL.

 

JLL has organized ConTech by its relative impact on construction, and whether the coronavirus affected that impact. Image: JLL

 

The report identifies the ConTech hierarchy into three groups:

Foundational technologies that have become standard fare for AEC firms. These include BIM and CAD, digital twins, Artificial Intelligence (AI), and digital collaboration;

Primary impact technologies that are gaining acceptance, such as scanning, drones, and modular construction; and

Secondary impact technologies that are still in their early stages of adoption. Wearables falls into this category, as do 3D printing, robotics, AR/VR, and tools related to payments/finance, equipment/materials, and jobs/employment.

JLL believes that BIM and CAD, scanning, and digital collaboration each got a “pandemic boost,” whereas AI may have lost some steam. Scanning, for example, gained importance during the health crisis “as a way to replace additional eyes onsite, and as a substitute for in-person meetings and walkthroughs.” Prior to the pandemic, scanning was a more efficient and comprehensive way to collect data. But under regulations where a limited number of staff can be onsite at any time, “interior scanning has often become a necessity to ensure that all members of a project teams are on the same page, even if they cannot be onsite.”

 

ROBOTS AND 3D PRINTERS STILL HAVE A WAYS TO GO FOR INDUSTRY ACCEPTANCE

 

Venture capital funding for ConTech during 2020 was in line with levels over the past five years. Image: JLL

 

Drones, says JLL, got a moderate boost from the pandemic because “of their ability to do the work of multiple people, and to do so in a way that keeps people socially distanced.”

And while many AEC firms claim to be embracing modular construction for quicker project delivery, JLL finds that the impact of the pandemic hasn’t been much of a factor on leading more firms to this method. “On the positive side, modular manufacturing can be done in a controlled factory setting, with the ability for extensive preplanning to maintain social distancing without the unknowns of an active jobsite. On the negative side, modular construction remains an economically high-risk endeavor.”

The pandemic also has had mixed impact on other ConTech tools. Its effect on the adoption of 3D printing, for example, was low, says JLL, which predicts that the future of 3D printing is brighter for single-family home construction or certain military applications than for nonresidential construction.

JLL is a bit more sanguine about robotics, which got a moderate boost from the pandemic. “With the addition of AI, this sector is developing for more advanced tasks, including fully automated excavation or interior chalk lining.” Nevertheless, JLL expects robots to be used on a limited basis for pilot projects for at least the next few years.

Augmented and virtual reality are still in their early development stages, and both have the potential to become standard on construction projects. But, JLL cautions, “they will only work on projects with high adoption of other forms of tech that would be required for integration.”

Related Stories

AEC Tech | Jul 29, 2019

2019 Bluebeam Extreme Conference: Peer-to-Peer Learning at Scale

XCON 2019 to focus on collaborative partnerships and what works in digital construction

Multifamily Housing | Jul 23, 2019

Is prefab in your future?

The most important benefit of offsite construction, when done right, is reliability.

AEC Tech | Jul 15, 2019

Lack of standards hampers development of exoskeleton industry

Guidelines, common terminology, and testing methodology are needed, says expert. 

AEC Tech | Jul 15, 2019

Investors eye startups focused on automating construction

Investors could reap big payoffs in an industry that experts say is ready for automation.

AEC Tech | Jul 12, 2019

A new Dodge-Viewpoint report gauges how well contractors gather and use jobsite data

Information is power, but are contractors collecting what they need to make better decisions?

| Jul 11, 2019

Pepper Construction is using 3D models to help identify underground utilities on jobsites

Overlaying new installs and site surveys add precision to the construction process.

AEC Tech | Jul 10, 2019

Blue Collar Labs launches Builder’s Almanac, an online construction technology evaluation platform

The free online resource aims to eliminate subjective bias from the contech software evaluation process. 

AEC Tech | Jul 2, 2019

Living in a cloud: What nanotech means for architecture and the built environment

Could there come a time when buildings will become less about bricks and mortar and feel more like mists or fogs?

AEC Tech | Jun 28, 2019

In London, Autodesk homes in on construction management

The software goliath sounds the alarm about the urgent need for productivity improvements to address unbridled urbanization.

Giants 400 | Jun 26, 2019

How are the AEC Giants faring in the tech arms race?

About half (42%) say their firm is “on par” with their most-direct AEC competitors.

boombox1
boombox2
native1

More In Category


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021