Walsh Construction, one of the largest contractors in the city of Chicago and in the United States, is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility (ACF) for novel coronavirus patients.
Construction on the first 500 beds was completed on April 3. According to a report in the Chicago Tribune, 500 more beds (with 14 nursing stations) should be online this week and another 1,250 by April 20, with another 750 to follow. The facility will have the capacity to treat up to 3,000 low- to moderate-acuity patients across three of the convention center’s halls, where patients will be separated by level of care required.
In addition to patient rooms, the first phase has also seen installation of spaces for laundry machines, pharmacy services, medical supplies, housekeeping, and medical gas canister storage, according to the Chicago Tribune.
A Walsh Construction staff member views the first phase of the conversion of portion of the McCormick Place Convention Center into an alternate care facility for coronavirus patients. Photo: Press Pool
ARMY CORPS OF ENGINEERS, MPEA OVERSEEING CONVERSION OF THE CONVENTION FACILITY
The Metropolitan Pier and Exposition Authority (MPEA) in association with the United States Army Corps of Engineers is directing the conversion of McCormick Place into a facility focused on patient care, infection control, fire protection and life safety. The ACF is designed to relieve pressure on the hospital system by freeing up beds for more patients with severe COVID-19 cases in anticipation of the surge in positive COVID-19 diagnoses to come.
The temporary field hospital is expected to be complete by April 24, according to Walsh Construction. “We mobilized and began work immediately,” said Thomas Caplis, Vice President of Healthcare at Walsh Construction. “Walsh Construction is proud to support these extraordinary efforts of MPEA and Army Corps of Engineers that will offer essential care to our Chicago neighbors and much needed assistance to our vital healthcare system.”
Chicago-based Walsh Construction has a successful history of working directly with USACE and the Federal Emergency Management Agency to renovate and construct facilities and infrastructure on a fast-track basis. Throughout the COVID-19 pandemic, Walsh has assisted healthcare institutions with trailers, tents, cargo boxes, negative pressure rooms, and establishing other temporary measures on an as-needed basis.
WALSH—122 YEARS IN OPERATION
Walsh Construction is the fifth largest healthcare contractor in the United States, providing construction services and delivering healing environments across North America. The Acute Care Facility at McCormick Place adds to its list of patient-first projects that include new hospitals, emergency departments, critical care units, and outpatient services.
Walsh Construction is part of The Walsh Group, a 122-year-old company providing design, build, finance and activation services across the building, transportation and water markets. The Walsh Group operates as Walsh Construction, Archer Western and Walsh Canada throughout 20 regional offices.
Related Stories
Coronavirus | Apr 26, 2020
PCL Construction rolls out portable coronavirus testing centers
The prefabricated boxes offer walk-up and drive-thru options.
Coronavirus | Apr 23, 2020
It's time to make your back-to-the-office plan
Here are some practical, tactical considerations for reuniting.
Coronavirus | Apr 22, 2020
Architecture Billings Index points to major downturn in commercial construction
Largest monthly decline in billings a direct result of pandemic response.
Coronavirus | Apr 22, 2020
Construction activity in 2020 expected to drop steeply
[Dodge survey] Contractors girding for recession.
Coronavirus | Apr 21, 2020
COVID-19 update: CallisonRTKL, Patriot, PODS, and USACE collaborate on repurposed containers for ACFs
CallisonRTKL and PODS collaborate on repurposed containers for ACFs
Coronavirus | Apr 20, 2020
Virtual site visits help control infection on project sites
As COVID-19 threatens to slow construction work, point cloud technology helps us work safer and faster.
Coronavirus | Apr 19, 2020
IoT system helps contractors keep their distance on the jobsite
Triax Technologies’ wearable Proximity Trace device can be used for contact tracing.
Coronavirus | Apr 19, 2020
A COVID-19 task force focuses on crisis communications
The Castle Group is partnering with leading health experts to help companies factor science and medicine into their response messaging and actions.
Coronavirus | Apr 17, 2020
NMHC Multifamily Construction Survey shows significant delays in apartment construction
Survey asked construction firms how the spread of COVID-19 is affecting construction permitting, starts, completions, materials and labor.
Coronavirus | Apr 17, 2020
The case for public space in the age of COVID-19
As our daily footprint narrows under “stay at home” measures, we must reconsider our relationship with public spaces.