A six-story, 180,000-sf patient tower addition to BayCare St. Joseph’s Hospital in Tampa, Fla., was well under way when, in the summer of 2020, the healthcare system wanted to open three patient floors earlier than scheduled to accommodate the COVID-19 pandemic’s anticipated surge.
The project’s construction manager, Robins & Morton, brought in additional supervisory staff to coordinate this compressed schedule with other building team members, which included AE firm HOK and structural engineer Carastro Engineering. As a result of this collaboration, the tower opened two months early, in July 2020, says Robins & Morton’s President and COO Robin Savage.
This has been a common tale during the pandemic, told by AEC firms whose healthcare clients want their projects up and running quicker, a task made more complicated by the shortage of skilled labor in many markets.
“A major challenge has included changes made during design and construction while maintaining the budget,” states Matthew Holmes, Global Solutions Director of Health Infrastructure for the construction management firm Jacobs, 70 percent of whose healthcare-related work last year involved in-patient design. To mitigate this issue, Jacobs continuously forecasts estimates during a project to leverage proper budgeting. “Taking the time to accurately scope the project in the budgeting process is essential,” Holmes says.
“The healthcare core market continues to operate on razor-thin margins,” observes Hamilton Espinosa, DPR Construction’s Healthcare Core Market Leader. “The need to project value and efficiency is at the forefront of key decision-making.”
A geotechnical report conducted during preconstruction of a 32,000-sf Veterans Affairs outpatient clinic in Johnson County, Kan., uncovered an unexpected need for rock excavation totaling $150,000. McCownGordon Construction, the project’s CM, reduced that allowance to $100,000 by rerouting the water, fire, and storm utilities, recalls Daniel Lacy, the firm’s Vice President−Healthcare and Life Sciences.
Many of Jacobs’ healthcare projects entail what Holmes calls “progressive design-build,” where the designer and builder work together “from day one with an established budget and program description.” Early project team engagement, asserts Pepper Construction’s Project Director Brian Mullen, CHC, LEED AP, is critical because “it leads to more informed design.” And by remaining flexible to accommodate future improvements in interior remodeling, Pepper “can help ensure that clients are prepared to incorporate the latest technology.”
By aligning a project manager with key designer, trade partner, and healthcare system personnel, McCarthy Building Companies is able to “triage” questions and ask only what’s needed to move the project forward. Then, it can provide options for consideration, says Patrick Peterson, McCarthy’s Executive Vice President of Healthcare for the Southern California region.
AEC firms have had to be creative to find skilled labor to complete healthcare projects within time and budget parameters. To connect with smaller and more diverse subcontractors, Skanska breaks up its bid packages “to widen the labor pool,” says Chris Hopper, its Vice President and General Manager. Skanska also conducts its Construction Management Building Blocks Training Program in its offices across the country to engage smaller subs through partnership and business development.
HEALTHCARE PROJECTS BACK ON TRACK
AEC Giants contacted for this report say they’ve been working on a wide range of healthcare projects. But the agenda for some clients shifted between 2020 and 2021.
Most of Henderson Engineers’ healthcare projects over the past year were for “temporary measures” that included infrastructure to support care for COVID-19 patients, says Mark Chrisman, Healthcare Practice Director for Henderson Engineers and Henderson Building Solutions. But since early 2021, “demand for construction and renovation projects of all sizes has reverted close to pre-pandemic levels.”
During the pandemic, DPR Construction pivoted to respond to help with clients’ immediate needs. But much of its work continued to be for new hospitals and patient tower expansions. There’s strong demand for outpatient care, too, although health systems are re-evaluating program sizes to factor the impact of virtual healthcare and remote patient monitoring for lower-acuity chronic case management, say Sean Ashcroft and Deb Sheehan, DPR’s Healthcare Core Market Leader and Healthcare Strategy Lead, respectively.
While new construction that included the nine-story Children’s Mercy Research Institute in Kansas City, Mo., accounted for McCownGordon’s largest recent healthcare projects, the majority, in terms of volume, have been adaptive reuse, says Lacy. McCarthy’s Peterson points out that healthcare clients are exploring strategies for maintaining aging buildings and repurposing existing spaces for “a changing service model.”
AEC firms are engaging more renovations and expansions, too. McCarthy recently worked on the Loma Linda University Medical Center’s Campus Transformation Project to bring it up to California’s seismic compliance requirements.
Brian Forsythe, LEED AP, CHC, Pepper’s Vice President and Project Director, predicts that clients who have delayed master-planning projects will need to move forward to remain competitive. And he cites a trend toward public-private partnerships to fund healthcare projects, such as the University of Illinois Health’s 205,000-sf Outpatient Surgery Center and Specialty Clinics in Chicago, for which Provident Resources Group, a 501(c)(3) corporation, is financing three-quarters of the building’s $194 million total cost through tax-exempt bonds, and will lease the building to UI Health during the 30-year term of the bonds. This project should be completed next year.
UNIVERSAL PATIENT ROOMS ARE IN VOGUE
Alternative project delivery is among the design and construction trends that have emerged in the healthcare sector. The University of Illinois project, designed by Shive Hattery, deployed modular construction to stay within budget. One of Robins & Morton’s priorities is to determine how to leverage prefabrication and modularization, says Savage. And during the pandemic, the controlled environment and potentially higher production rates that prefab offers “took on a renewed sense of urgency” for McCarthy. Peterson says prefab systems his firm now focuses on include exterior envelopes, framing and wall panels, MEP, medical and interiors, bathrooms, and vertical transportation.
Skanska is among the AEC firms that have been getting more requests for larger private and “universal” rooms. For its University of Virginia Health System hospital expansion in Charlottesville, Skanska built a patient tower with fully ICU-compliant universal patient beds. Chrisman of Henderson Engineers says that healthcare providers are showing a “strong desire” to establish permanent isolation rooms to manage patients during infectious disease outbreaks.
Other trends in healthcare projects that Jacobs’ Holmes is seeing include high-end technology for patient and procedural spaces, combined heat and power turbines for steam and electricity, combined pre- and post-recovery bays, more space allotted for telehealth and behavioral health, and growth in emergency departments.
The Phoenix-based architectural planning and interior design firm Orcutt | Winslow has experimented lately with alternate structural solutions to steel framing and joists, such wide-flange structural frames and steel-masonry hybrids. The firm is also increasingly using Lean approaches, such as pull planning, to improve a project’s speed to market, says Chuck Hill, its Healthcare Studio Leader.
Matthew Kennedy, Orcutt | Winslow’s Senior Healthcare Planner, adds that his firm has tried out several digital media platforms—such as Miro and Microsoft Teams—for communications and file sharing. It’s not alone, as virtual interaction has become the norm in a socially distanced world.
When the pandemic hit, Skanska saw an opportunity to use StructionSite, a project site photo documentation software, to conduct virtual job walks abetted by advanced imagery and video. Pepper leverages web-based platforms “to bring everyone to the jobsite virtually,” says Forsythe. During the pandemic, Pepper also launched Virtual Reality Training modules, and expanded its use of TouchPlan with the Last Planner System for digital pull planning. Robins & Morton’s application of technology for healthcare projects includes entirely virtual mockups, 3D printing, augmented reality, and testing robots to photograph and laser-scan jobsites.
SUSTAINABLE AND RESILIENT HEALTHCARE BUILDINGS
Healthcare systems are trying to change their reputation for being profligate users of energy and water by seeking project solutions for efficiency, carbon neutrality, sustainability, and resilience.
Savage of Robins & Morton points out that healthcare clients are interested in stemming carbon emissions that are mostly released from the material supply chain before a new or renovated facility even opens. Skanska’s Hopper cites a 2020 Health Affairs study, which estimated that the healthcare industry accounted for more than 8 percent of CO2 emissions in the U.S. “Healthcare systems have made carbon reduction a part of their collective mission and values,” says Hopper.
Concerns about embodied carbon can be tied to a larger effort among healthcare systems and their AEC partners in favor of environmental sustainability and resilience. One of Robins & Morton’s projects—the recently completed Fisherman’s Community Hospital in Marathon, Fla.—sits on higher elevation to combat storm surges, has a tilt-up concrete core, and includes impact-resistant exterior and removable flood barriers.
Chrisman expects larger healthcare systems with financial means to be the main drivers of sustainability and resilience over the next decade. Client demand was one of the reasons why Henderson last April hired its first director of sustainability, Brian Alessi, AIA, LEED AP BD+C, who has worked on more than 400 LEED-certified, net-zero, and passive house projects.
By August 29, Louisiana had evacuated 22 nursing homes and 18 assisted living facilities as Category 4 Hurricane Ida was pounding that state’s coast. However, 2,400 COVID-19 patients still in Louisiana hospitals hadn’t been moved, partly because there was no other place to put them, but also because modern hospitals are better prepared to stay open during natural disasters.
“COVID-19 has made clear there is a need to increase and maintain resilient healthcare systems through a holistic approach to how, when, and where we access care,” says Jacobs’ Holmes. “Sustainability is a required item and, at Jacobs, that means ensuring long-term business resilience.”
McCarthy’s Peterson says that resilience “is built into every healthcare design we see.” And Hill of Orcutt | Winslow is confident that once this sector is less distracted by its immediate supply-chain issues, “resilience will emerge as a driver” for healthcare projects.
Related Stories
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 10, 2013
Modular Pedia-Pod: Sustainability in healthcare construction [slideshow]
Greenbuild 2013 in Philadelphia was the site of a unique display—Pedia-Pod, a modular pediatric treatment room designed and built by NRB, in collaboration with the editors of Building Design+Construction, SGC Horizon LLC, and their team of medical design consultants.
| Dec 3, 2013
Creating a healthcare capital project plan: The truth behind the numbers
When setting up a capital project plan, it's one thing to have the data, but quite another to have the knowledge of the process.
| Nov 27, 2013
Pediatric hospitals improve care with flexible, age-sensitive design
Pediatric hospitals face many of the same concerns as their adult counterparts. Inpatient bed demand is declining, outpatient visits are soaring, and there is a higher level of focus on prevention and reduced readmissions.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 27, 2013
LEED for Healthcare offers new paths to green
LEED for Healthcare debuted in spring 2011, and certifications are now beginning to roll in. They include the new Puyallup (Wash.) Medical Center and the W.H. and Elaine McCarty South Tower at Dell Children’s Medical Center of Central Texas in Austin.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.