flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 made payment delays to contractors much worse

Codes and Standards

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.


By Peter Fabris, Contributing Editor | July 1, 2021

The COVID-19 pandemic appears to have made payment delays to contractors much worse, according to a report from construction software firm Levelset.

Just 9% of companies always get paid on time, a decline of 60% from last year, says Levelset’s 2021 Construction Cash Flow & Payment Report. Just one construction contractor in 10 always gets paid in full, a 75% drop from before the pandemic.

GCs typically fare better than subs. General contractors are four times more likely than subcontractors to get paid within 30 days, and 50% more likely to get paid in full. One in five subcontractors and suppliers often have to wait more than 60 days for payment.

A full 56% of subcontractors wait more than 60 days to collect retained funds, compared to just 16% of general contractors.

Related Stories

| Oct 9, 2014

Seattle puts restrictions on micro apartments

The Seattle City Council passed new rules that new studio apartments in the city must measure at least 220 sf and contain at least two sinks.

| Oct 9, 2014

Cities get creative with stormwater management

Cities around the world are crafting stormwater management policies that include natural and manmade methods to store and absorb runoff to reduce flooding.

| Oct 2, 2014

Fannie Mae study says affordable rental units more energy efficient than market-rate units

Fannie Mae’s new report on energy usage in the multifamily sector found that affordable properties use 28% less energy per unit and are 29% smaller than market-rate properties.

| Oct 2, 2014

California Energy Commission launches code upgrade process

The California Energy Commission launched the upgrade process to Title 24, the state energy code, last month.

| Oct 2, 2014

Canals to mitigate flooding could be in Boston’s future

The Urban Land Institute held brainstorming sessions over the last several months involving more than 70 engineers, architects, and development and insurance specialists to examine how rising sea levels would affect four representative areas in and around Boston.

| Oct 2, 2014

Los Angeles reverses ban on high-rise slanted roofs and spires

Los Angeles reversed course last month on a regulation that had barred skyscrapers from having slanted roofs or spires.

| Sep 29, 2014

10 common deficiencies in aging healthcare facilities

VOA's Douglas King pinpoints the top issues that arise during healthcare facilities assessments, including missing fire/smoke dampers, out-of-place fire alarms, and poorly constructed doorways. 

| Sep 29, 2014

Report finds links between office design, health and productivity

A new report from the World Green Building Council finds “overwhelming evidence” to support office design as a significant influencer of the health, wellbeing and productivity of staff.

| Sep 29, 2014

San Francisco office tower is first U.S. building to earn LEED Platinum v4 certification

One Sansome Street, San Francisco is the first building in the U.S. to achieve LEED Platinum v4 certification. The building is also only the second property worldwide to be awarded with v4 certification.

| Sep 29, 2014

Navy to begin BIM phased implementation in October

The U.S. Naval Facilities Engineering Command will begin its Building Information Management and Modeling (BIM) Phased Implementation Plan in October.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021