Creating the foundation for a Digital Twin

Digital Twin

Creating the foundation for a Digital Twin

By following these guidelines, organizations can harness the power of Digital Twins to optimize facility management, maintenance planning, and decision-making throughout the building’s lifecycle.


By Timothy King, RA, LEED AP, Senior Vice President, and Julio Hernandez, AIA, Senior Architect, CDM Smith | July 31, 2023
Creating the foundation for a Digital Twin CDM Smith
This illustration represents the various assets of WSSC Water’s expansion project including the laboratory and the mechanical and electrical systems. Courtesy: CDM Smith

Building Information Modeling (BIM) has become a standard practice in the construction industry, revolutionizing the design and construction phases of buildings. However, building owners are now realizing the potential of extending the use of BIM beyond construction into facility management. This has led to the emergence of the Digital Twin concept, which leverages the as-built BIM model as an exact digital replica of the built structure. By collecting data through sensors and tracking systems, the Digital Twin enables facility owners to analyze and forecast facility repairs and maintenance over the building's lifespan. 

Aligning the BIM model with the owner’s asset management system is the crucial first step in creating a Digital Twin. Designers can ensure that the Digital Twin meets the owner’s long-term needs by effectively communicating objectives, addressing client concerns, and engaging the facilities management team. Considerations such as aligning the asset registry with the owner’s Computerized Maintenance Management System (CMMS), establishing BIM Level of Development (LOD) by system or element, and incorporating critical asset data for long-term operations are essential for a successful Digital Twin implementation. Collaboration with vendors and manufacturers who provide accessible BIM data further enhances the integration and management of the Digital Twin. 

By following these guidelines, organizations can harness the power of Digital Twins to optimize facility management, maintenance planning, and decision-making throughout the building’s lifecycle.

Talk with the Owner

When introducing the concept of an as-built BIM to clients, designers should communicate the objectives and expectations of the Digital Twin project. By addressing any concerns the client may have, designers can align long-term objectives and ensure that the Digital Twin meets the owner's needs. Designers should also engage the facilities management team in project discussions. You should discuss the following considerations.

  1. Asset Registry Alignment with the Owner's CMMS: The asset registry, which catalogs the equipment and components within the Digital Twin, should be aligned with the owner's CMMS. This integration enables the seamless transfer of asset information, such as maintenance schedules, historical data, and work orders, facilitating efficient maintenance planning and execution.
  2. BIM LOD by System or Element: The BIM model's LOD, which defines the level of detail and accuracy, should be established by the system or element in the Digital Twin. This ensures that critical systems or elements, such as HVAC, electrical, or structural components, are represented with the necessary level of fidelity for accurate simulation and analysis.
  3. Critical Asset Data for Long-Term Operations: Identifying and incorporating the specific asset data that the owner will utilize for long-term operations is crucial. This can include information such as equipment specifications, maintenance history, warranties, energy consumption, and performance metrics. By integrating this data into the Digital Twin, owners can make informed decisions regarding maintenance strategies, energy optimization, and asset lifecycle planning.


Develop Your Asset Registry

The integration between BIM models and asset management platforms is often lacking, resulting in misaligned asset data and CMMS data. To address this issue, designers who possess expertise in BIM can play a crucial role during the design phase by aligning the asset registry and BIM model. During the design phase, or around 90% design, an asset registry should be created to align with different building equipment, components, or systems. In these two examples, the owner requested that each asset within the BIM model include the following information at a minimum. 

Table 1: In these two examples, the owner requested that each asset within the BIM model include the following information at a minimum. Courtesy: CDM Smith
Table 1: In these two examples, the owner requested that each asset within the BIM model include the following information at a minimum. Courtesy: CDM Smith

Single vs Grouping Assets

To provide a clear understanding of the asset registry and the BIM model, let’s examine how they work together. In the asset registry, you can find a description of the same asset that is also present in the BIM model. It allows for easy cross-referencing and ensures consistency between the two. 

It’s important to note that certain assets are more suitable as individual components, while others are better organized as part of an entire building system. For example, an air handler is typically considered an individual asset, whereas a laboratory exhaust system is better classified as a grouped system. By considering this distinction, you can optimize the organization and management of assets within the registry and BIM model. This captures the complexity of the building systems while maintaining clarity and coherence.

 In blue, single asset – exhaust fan. In green, group of assets – lab exhaust system. Courtesy: CDM Smith.
Figure 1: In blue, single asset: exhaust fan. In green, group of assets: lab exhaust system. Courtesy: CDM Smith

Creating a Digital Twin requires a shift in the designer’s approach to BIM. Designers need to adopt a long-term perspective that extends beyond construction and incorporates facility management workflows. Manufacturers have recognized the importance of BIM and have made efforts to make their data easily accessible. In some cases, they have developed software that seamlessly integrates with industry-wide BIM programs. 

Establishing digital connections with vendors allows facility managers to utilize the data flow into BIM for effective management decisions. During the submittal process, it is possible to have a vendor provide an accurate BIM component or system that can be incorporated into the BIM model. This limits the effort of the design team to transfer the information from contractor submittals into the model. 

Application and Lessons Learned

To meet the demands of a growing population in the DC area, WSSC Water embarked on a project to expand their environmental laboratory facility in Silver Spring, Maryland. WSSC Water aimed to increase operational and analytical efficiency and achieve LEED Silver Certification for the new facility. This project provides opportunities for WSSC Water to reimagine their asset registry development process by leveraging advancements in machine learning, artificial intelligence, the Internet of Things (IoT), and data collection methods in the future.

Figure 2: Rendering of WSSC Water’s environmental laboratory expansion project in Silver Spring, Maryland. Courtesy: CDM Smith
Figure 2: Rendering of WSSC Water’s environmental laboratory expansion project in Silver Spring, Maryland. Courtesy: CDM Smith

WSSC Water collaborated with the architect to develop a BIM model during the design phase. This model served as a repository of all assets anticipated for construction. During ongoing construction administration, real-time as-built data provided by manufacturers through construction submittals and requests for information are integrated into the BIM model. 

Each asset was linked to product data, Uniformat codes, material properties, and manufacturer information that will be handed over to WSSC Water upon construction completion. With a digital as-built model, WSSC Water’s facilities management team can take the next step of integrating live-stream information and establishing a Digital Twin of the new laboratory.

Figure 3: This illustration represents the various assets of WSSC Water’s expansion project including the laboratory and the mechanical and electrical systems. Courtesy: CDM Smith
Figure 3: This illustration represents the various assets of WSSC Water’s expansion project including the laboratory and the mechanical and electrical systems. Courtesy: CDM Smith

Several challenges or opportunities were discovered during the as-built development phase of work.

Creating consistent parameters for each asset across disciplines. As the team started to assign parameters for each discipline model, we discovered that the method of creating parameters needed to be more consistent. For consistency across discipline models, we established a format and assigned a single BIM coordinator to create these parameters for quality assurance. Information such as Uniformat code and manufacturer name are custom parameters applicable to all assets in every discipline. Establishing a project-wide method for assigning these common parameters across disciplines early in the design phase will pay off later when specific asset information is needed and can be easily filtered. 

Managing design changes during construction administration. During construction, it is common for product substitutions to be made and designs to be altered. Tracking these changes in the as-built BIM model can be tedious and time-consuming. These changes may also require the complete removal of a basis-of-design system with the new product being proposed. During design, WSSC Water selected demountable partitions to allow for future re-configuration of offices and laboratories. 

As a basis of design, we worked with a manufacturer that provided custom geometry imported into BIM. The asset data embedded within the geometry met and exceeded client expectations. However, during construction, the contractor selected a similar product from a different manufacturer whose BIM geometry was not as robust as the basis of design. The best solution is to require manufacturers to provide updated geometry in the specifications to support the as-built model. Whoever is managing the model should anticipate spending time changing out the basis of design to match the constructed assets.

Related Stories

| Aug 11, 2010

Construction under way on LEED Platinum DOE energy lab

Centennial, Colo.-based Haselden Construction has topped out the $64 million Research Support Facilities, located on the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) campus in Golden, Colo. Designed by RNL and Stantec to achieve LEED Platinum certification and net zero energy performance, the 218,000-sf facility will feature natural ventilation through operable ...

| Aug 11, 2010

NASA plans federal government's greenest building

NASA is set to break ground on what the agency expects to be the highest-performing building in the federal government's portfolio. Named Sustainability Base, the building at Ames Research Center in Sunnyvale, Calif., will be a showplace for sustainable technologies, featuring some of the agency's most advanced recycling and intelligent controls technologies originally developed to support NASA...

| Aug 11, 2010

Stimulus funding helps get NOAA project off the ground

The award-winning design for the National Oceanic and Atmospheric Administration’s new Southwest Fisheries Science Center replacement laboratory saw its first sign of movement last month with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act.

| Aug 11, 2010

Robotic storage facility protects exotic automobiles, fine wines, artwork

Miller Construction Company, Fort Lauderdale, Fla., has completed construction on a high-tech robotic storage facility designed to store and protect valued possessions such as exotic automobiles, fine wines, artwork, and jewelry. Designed and built to resist Category 5 hurricanes, the RoboVault facility features automated storage retrieval, biometric recognition, private access with 24/7 securi...

| Aug 11, 2010

Research Facility Breaks the Mold

In the market for state-of-the-art biomedical research space in Boston's Longwood Medical Area? Good news: there are still two floors available in the Center for Life Science | Boston, a multi-tenant, speculative high-rise research building designed by Tsoi/Kobus & Associates, Boston, and developed by Lyme Properties, Hanover, N.

| Aug 11, 2010

Special Recognition: Triple Bridge Gateway, Port Authority Bus Terminal New York, N.Y.

Judges saw the Triple Bridge Gateway in Midtown Manhattan as more art installation than building project, but they were impressed at how the illuminated ramps and bridges—14 years in the making—turned an ugly intersection into something beautiful. The three bridges span 9th Avenue at the juncture where vehicles emerge from the Lincoln Tunnel heading to the Port Authority of New Yor...

| Aug 11, 2010

American Tobacco Project: Turning over a new leaf

As part of a major revitalization of downtown Durham, N.C., locally based Capitol Broadcasting Company decided to transform the American Tobacco Company's derelict 16-acre industrial plant, which symbolized the city for more than a century, into a lively and attractive mixed-use development. Although tearing down and rebuilding the property would have made more economic sense, the greater goal ...

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021