flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cross-laminated timber performs better than expected in shear test

Codes and Standards

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.


By Peter Fabris, Contriubting Editor | May 18, 2021

Courtesy Pixabay

The American Wood Council recently released the results of full-scale tests of cross-laminated timber (CLT) diaphragms.

The findings indicated that the connections performed better than expected, resulting in higher-than-expected shear capacities of the diaphragms.

“In order to fully understand the full-scale CLT diaphragm test results done last year, we needed to better understand some of the connections that were used in the full-scale tests,” said AWC Vice President of Engineering Bradford Douglas, P.E. “The results of these latest tests could lead to changes allowing more efficient CLT diaphragm designs in the future.”

The tests were conducted in support of new criteria for the CLT diaphragm design approach included in the 2021 Special Design Provisions for Wind and Seismic (SDPWS). The connection testing augments the full-scale diaphragm testing completed in 2020 and focuses on the structural performance of the individual connections of the diaphragm, designed in accordance with the National Design Specification for Wood Construction.

Related Stories

Codes and Standards | Aug 12, 2021

AGC pushes for more environmentally friendly construction

Contractor trade group supports government investment, tax incentives to reduce carbon footprints.

Codes and Standards | Aug 11, 2021

Decentralized approach to codes means emissions reduction responsibility falls on local officials

Efficiency advocates focusing more on local code amendments.

Digital Twin | Aug 9, 2021

Digital Twin Maturity white paper offers guidance on digital twin adoption

Provides lifecycle map and an approach for incorporating digital twins.

Codes and Standards | Aug 5, 2021

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.

Codes and Standards | Aug 4, 2021

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.

Codes and Standards | Aug 3, 2021

Dept. of Energy releases initial version of the Spawn of EnergyPlus software

Targets new use cases in advanced controls, district systems, and grid integration.

Codes and Standards | Aug 2, 2021

Several U.S. cities among most expensive places to build in the world

San Francisco, New York, and Boston head the domestic list.

Codes and Standards | Jul 28, 2021

American Concrete Institute creates new director of innovative concrete technology post

Aim is to attract emerging technologies for development.

Codes and Standards | Jul 28, 2021

Higher ed faces infrastructure backlog of $112.3 billion

Study recommends integrated strategic planning for best results.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021