The Construction Specifications Institute (CSI) and ICC Evaluation Service, LLC (ICC-ES), today announced they have signed a Memorandum of Understanding (MOU) to strengthen the relationship between CSI’s GreenFormat and the ICC-ES Environmental program.
ICC-ES currently references CSI’s MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.
“CSI’s GreenFormat identifies and organizes the sustainable attributes of building products,” said CSI Executive Director and CEO Walter Marlowe, P.E., CSI, CAE. “By collaborating with ICC-ES, it will help increase awareness and use of GreenFormat, particularly with products compliant to the 2012 International Green Construction Code (IgCC), so that professionals who select building products can make informed choices.”
“This MOU recognizes the complementary nature of ICC-ES and CSI’s GreenFormat in the sustainable building sector and demonstrates added value to environmental reports,” said Rob Brooks, Director of ICC-ES Environmental Programs. “While CSI provides a uniform structure for manufacturers to report the sustainable characteristics of their products through GreenFormat, ICC-ES provides evidence that products meet requirements of codes and green building standards.”
Among the agreements included in the MOU:
-
ICC-ES will add GreenFormat’s numbering scheme within new and existing ICC-ES Environmental Evaluation reports (Verification of Attributes Reports™ and Plumbing, Mechanical and Fuel Gas Listings) for environmental attributes.
-
ICC-ES and CSI will work together to maintain the relationship between GreenFormat categories and the questions in the ICC-ES Environmental Evaluation reports as both are updated and add references to new reports.
-
CSI will present ICC-ES Criteria to the GreenFormat task team for consideration as appropriate product evaluation tests within GreenFormat.
In addition, CSI and ICC-ES intend to participate in each other’s technical committees, where applicable.
GreenFormat provides a uniform structure for manufacturers to report the sustainable properties of their products. It helps industry professionals evaluate the green characteristics of building products they are considering for their projects.
The ICC-ES Sustainable Attributes Verification and Evaluation (SAVE) program provides manufacturers with independent verification that their products meet specific sustainability targets defined by today’s codes, standards and green rating systems. The ICC-ES SAVE and PMG Listing programs both evaluate the compliance of products to a subset of GreenFormat attributes. BD+C
Related Stories
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
BIM and Information Technology | Apr 9, 2015
A carboard box by Google can bring virtual reality to architecture
The global search engine giant has launched a new product, Google Cardboard, that easily allows users to experience virtual reality.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.