flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?

CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?


By By BD+C Staff | November 4, 2011
CSI provides a uniform structure for manufacturers to report the sustainable characteristics of their products through GreenForm
This article first appeared in the December 2011 issue of BD+C.

The Construction Specifications Institute (CSI) and ICC Evaluation Service, LLC (ICC-ES), today announced they have signed a Memorandum of Understanding (MOU) to strengthen the relationship between CSI’s GreenFormat and the ICC-ES Environmental program.

ICC-ES currently references CSI’s MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.

CSI’s GreenFormat identifies and organizes the sustainable attributes of building products,” said CSI Executive Director and CEO Walter Marlowe, P.E., CSI, CAE. “By collaborating with ICC-ES, it will help increase awareness and use of GreenFormat, particularly with products compliant to the 2012 International Green Construction Code (IgCC), so that professionals who select building products can make informed choices.”

“This MOU recognizes the complementary nature of ICC-ES and CSI’s GreenFormat in the sustainable building sector and demonstrates added value to environmental reports,” said Rob Brooks, Director of ICC-ES Environmental Programs. “While CSI provides a uniform structure for manufacturers to report the sustainable characteristics of their products through GreenFormat, ICC-ES provides evidence that products meet requirements of codes and green building standards.”

Among the agreements included in the MOU:

  • ICC-ES will add GreenFormat’s numbering scheme within new and existing ICC-ES Environmental Evaluation reports (Verification of Attributes Reports™ and Plumbing, Mechanical and Fuel Gas Listings) for environmental attributes.

  • ICC-ES and CSI will work together to maintain the relationship between GreenFormat categories and the questions in the ICC-ES Environmental Evaluation reports as both are updated and add references to new reports.

  • CSI will present ICC-ES Criteria to the GreenFormat task team for consideration as appropriate product evaluation tests within GreenFormat.

In addition, CSI and ICC-ES intend to participate in each other’s technical committees, where applicable.

GreenFormat provides a uniform structure for manufacturers to report the sustainable properties of their products. It helps industry professionals evaluate the green characteristics of building products they are considering for their projects.

The ICC-ES Sustainable Attributes Verification and Evaluation (SAVE) program provides manufacturers with independent verification that their products meet specific sustainability targets defined by today’s codes, standards and green rating systems. The ICC-ES SAVE and PMG Listing programs both evaluate the compliance of products to a subset of GreenFormat attributes. BD+C


 

Related Stories

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| Aug 30, 2013

Local Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 29, 2013

First look: K-State's Bill Snyder Family Stadium expansion

The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history. 

| Aug 27, 2013

Industrial Sector Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2013 Giants 300 Report.

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 26, 2013

Chicago Bears kick off season at renovated Halas Hall

An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 22, 2013

Warehouse remake: Conversion project turns derelict freight terminal into modern office space [slideshow]

The goal of the Freight development is to attract businesses to an abandoned industrial zone north of downtown Denver.

| Aug 21, 2013

AIA: Architecture billings on the rise in July

The Architecture Billings Index for July was 52.7, up from a mark of 51.6 in June. This score reflects an increase in demand for design services (any score above 50 indicates an increase in billings).

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021