The cloud is coming of age. Fortune 500 companies like Coca-Cola and General Mills that once exclusively managed their own data centers are starting to migrate to the cloud. They’ve found that outsourcing vital IT infrastructure can be a reliable, cost-effective strategy.
The data center industry is projected to double by 2021 from its capacity in 2015, according to real estate consultant JLL. An expected explosion in Internet of Things applications will lead to even more bits and bytes being collected, stored, and analyzed. Factor in what JLL calls “American consumers’ insatiable thirst for digital content,” and you have explosive demand for data storage.
One new mini-trend: Cloud providers are spreading capacity near NFL cities, says Scott Ruch, AIA, Executive Managing Principal and Critical Facilities Sector Leader with Corgan, referring to large cities with National Football League teams.
New migrants to the cloud are also building their data centers to their large metro areas in order to sleep better knowing vital infrastructure is easily accessible near corporate offices. “They want the ability to check in on those facilities,” Ruch says. But rural areas with temperate climates (for more cost-efficient cooling) and low utility rates are still in the mix.
In Europe, some countries now require sensitive data to be housed within their borders. These regulations have complicated data center location decisions, in some cases forcing companies to build out sites in several countries rather than building one consolidated facility.
Data centers are getting cheaper to build. Five to 10 years ago, the average cost was $15-20 million per megawatt, Ruch says. Today, it’s $7-15 million. Customers are spending more wisely on risk mitigation. Shells to be used in high-risk hurricane and tornado zones must still be built to withstand 170-mph winds, but outside of those zones, less costly 120-mph-resistant structures will do.
UPS system design has been upgraded such that most facilities use block-redundant designs, which provide about 20% backup power redundancy, rather than more expensive two-end systems, with 100% redundancy. The smaller backup capacity is usually adequate for the mega-facilities being built by the big providers: if one site goes down completely, they can switch to another data center, Ruch says. Most of the big cloud providers have enough system-wide capacity to weather a short, single-site shutdown.
ALSO SEE: BD+C Giants 300 data centers rankings
Top 25 data center architecture firms
Top 30 data center engineering firms
Top 35 data center construction firms
RECYCLING OLDER DATA CENTERS
Many legacy data centers are becoming obsolete. As a result, a niche market in salvaged equipment has surfaced, says Jonathan Clay, President and CEO, The Blue River Group. Chillers, raised flooring, and backup generators can be reused, he says. Some older equipment is finding its way to Asia, Africa, and Mexico. “There’s no reason to put it in a landfill,” says Clay.
Data centers are also making significant strides in energy efficiency. Most cloud providers today aim for a power usage effectiveness rating of 1.25 or less, Ruch says, well ahead of the 1.5 to 1.6 PUE range of the last decade.
Indirect/direct evaporative cooling, known as IDEC, which uses outside ambient air for cooling purposes, has been refined to the point where even air temperatures in the low 80s can be suitable. Pinpoint cooling can be directed to specific racks rather than to the entire space, says Clay. Alternating hot racks with cool racks can also reduce the overall cooling burden. Removing the chassis from servers makes cooling more effective, too.
Some data centers track and publish their PUEs—some as low as 1.1—online and in real time, according to published reports. Big players like Google, Facebook, and Intel are leading the way. Salesforce recently said it has achieved net-zero greenhouse gas emissions and is now providing a carbon-neutral cloud for all customers.
These are encouraging developments. But with demand for storage capacity rising as fast as you can say YouTube, will data center providers be able to keep up?
SEE ALL 2017 GIANTS 300 RANKINGS
Related Stories
Giants 400 | Sep 4, 2018
Top 90 K-12 School Contractors + CM Firms [2018 Giants 300 Report]
Gilbane, Balfour Beatty, and CORE Construction Group are among the nation’s largest K-12 school sector contractors and construction management (CM) firms, according to Building Design+Construction’s 2018 Giants 300 Report.
Giants 400 | Sep 4, 2018
Top 75 K-12 School Engineering + EA Firms [2018 Giants 300 Report]
AECOM, KPFF, and IMEG are among the nation’s largest K-12 school sector engineering and engineering/architecture (EA) firms, according to Building Design+Construction’s 2018 Giants 300 Report.
Giants 400 | Sep 4, 2018
Top 150 K-12 School Architecture + AE Firms [2018 Giants 300 Report]
Stantec, DLR Group, and PBK top Building Design+Construction's ranking of the nation's largest K-12 school sector architecture and architecture/engineering (AE) firms, as featured in the 2018 Giants 300 Report.
Giants 400 | Sep 4, 2018
Top 45 Data Center Contractors + CM Firms [2018 Giants 300 Report]
Holder, DPR, and Turner lead Building Design+Construction's ranking of the nation's largest data center sector contractors and construction management (CM) firms, as featured in the 2018 Giants 300 Report.
Giants 400 | Sep 4, 2018
Top 55 Data Center Engineering + EA Firms [2018 Giants 300 Report]
Jacobs, ESD, and Syska Hennessy Group top Building Design+Construction’s ranking of the nation’s largest data center sector engineering and engineering/architecture (EA) firms, as featured in the 2018 Giants 300 Report.
Giants 400 | Sep 4, 2018
Top 40 Data Center Architecture + AE Firms [2018 Giants 300 Report]
Corgan, Gensler, and HDR head Building Design+Construction’s ranking of the nation’s largest data center sector architecture and architecture/engineering (AE) firms, as featured in the 2018 Giants 300 Report.
Giants 400 | Aug 31, 2018
Security, sustainability among priorities at nation's largest engineering firms
IMEG and Thornton Tomasetti join a growing number of firms that are tapping into the security technology and operations consulting business.
Giants 400 | Aug 28, 2018
Top 105 Healthcare Contractors + CM Firms [2018 Giants 300 Report]
Turner, McCarthy, and Brasfield & Gorrie top Building Design+Construction’s ranking of the nation’s largest healthcare sector contractors and construction management (CM) firms, as featured in the 2018 Giants 300 Report.
Giants 400 | Aug 28, 2018
Top 90 Healthcare Engineering + EA Firms [2018 Giants 300 Report]
Jacobs, WSP, and IMEG lead Building Design+Construction’s ranking of the nation’s largest healthcare sector engineering and engineering/architecture (EA) firms, as featured in the 2018 Giants 300 Report.
Giants 400 | Aug 28, 2018
Top 160 Healthcare Architecture + AE Firms [2018 Giants 300 Report]
HDR, HKS, and Perkins+Will top Building Design+Construction’s ranking of the nation’s largest healthcare sector architecture and architecture/engineering (AE) firms, as featured in the 2018 Giants 300 Report.