flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Data centers keep cool while staying hot-hot-hot

Data Centers

Data centers keep cool while staying hot-hot-hot

Cooling mission critical facilities efficiently is critical to their operations and profitability.


By John Caulfield, Senior Editor | July 25, 2018
Data centers keep cool while staying hot-hot-hot

The $28 million data center at St Jude’s Children's Research Hospital, Memphis. The project team for the three-story, 55,000-sf facility: Gensler (architect), Paradigm Structural Engineers (SE), Syska Hennessy Group (ME), Liles Energy Design Consultants (EE), Jensen Hughes (fire/life safety), and Flintco Inc. (GC). Photo: Joe Luther

Last January, Bcause LLC brought online a $65 million data center in Virginia Beach, Va., whose sole purpose is to mine Bitcoin. This is the largest cryptocurrency data center in North America. Bcause chose this location to serve Northern Virginia, the largest data center market in the U.S.

Last year, the U.S., Canada, Europe, and Asia Pacific absorbed 583.5 MW of new data center capacity. At least 400 MW more is under construction, according to JLL.

Over the past five years, data center construction has outpaced all other real estate categories, according to Site Selection Group. AEC firms active in the sector are enjoying the ride. Last year, the top five contractors in the sector put $4.4 billion worth of mission-critical facilities in place.

Ben Kaplan, SVP/GM of Turner Construction’s Global Critical Facilities Group, says demand for colocation data centers “remains quite strong,” even among cloud service providers that are building their own facilities. ("Colos" are data centers that rent server space to multiple entities.)

 

See also: Top 40 Data Center Architecture + AE Firms - 2018 Giants 300 rankings
See also: Top 55 Data Center Engineering + EA Firms - 2018 Giants 300 rankings
See also: Top 45 Data Center Contractors + CM Firms - 2018 Giants 300 rankings

 

One of Turner’s recent data centers, for colo/hybrid services provider QTS, is Project Joshua, a 445,000-sf greenfield building in Ashburn, Va., with 32 MW capacity, 180,000 sf in raised floor space, 60,000 sf of office and storage space, and reinforced walls that can withstand 125-mph winds.

 

One case where size really matters

Mega-facilities that exceed one million sf and 100 MW in capacity are impacting what’s getting built and where. Site Selection Group says seven of the biggest 13 centers under construction exceed a million square feet. In Huawei, China, a 4.3-million-sf data center is under construction.

Data center operator Raging Wire is building a 42-acre campus in Garland, Texas, that will house five buildings totaling one million sf and 80 MW of IT load. The first phase (201,000 sf, 16 MW), known as TX-1, was completed in June 2017. Page is providing master planning, architecture, MEP/FP design, interiors, and LEED consulting on the project.

John Major, AIA, Page’s Principal for Science & Technology, says the Raging Wire facility is unique in that its amenities are located at the center of the building. “Data centers aren’t typically workplaces,” he says. TX-1 incorporates Class A office space and hospitality-themed amenities to differentiate it from competitors and encourage prospective tenants to station dedicated teams at the facility.

Major says clients' approach to building mega–data centers seem to be shifting. While large campuses are certainly being developed, “the tranches of deployment have been scaled down dramatically to facilitate faster speed-to-market and lower first-tranche cost,” he says.

Speed-to-market and capital cost advantages have made constructing single-tenant data centers via third-party developers an “increasingly popular delivery model” for large technology users in cloud services and media offerings, note Gensler's Vaughn Lamar, LEED AP, Senior Associate and Project Architect, and Jackson Metcalf, LEED AP, Associate and Technical Designer.

Among such projects is Gensler’s work for St. Jude’s Children’s Research Hospital, Memphis, Tenn., which consolidated operations of three buildings. A new fiber ring around the campus provides faster service and better connectivity.

 

Controlling water use for cooling

Reliability, especially as a hedge against natural disasters, is paramount to any data center’s operations. The BBVA Technology Center, Atizapan, Mexico, provides critical IT support for the bank’s worldwide operations. Its location—on high ground at the edge of Mexico City, an active earthquake region—made it imperative that this 31,025-sm facility be designed to the highest levels of safety and redundancy.

Skidmore, Owings & Merrill, lead designer on this Tier IV data center, protected the building from seismic events through progressive collapse design strategies and a foundation isolator beneath the building, explains Kim Van Holsbeke, Associate Director in SOM’s New York office.

Data center operators are also paying close attention to the environmental impact of their facilities.

“Right now, the big trend is water,” says Robert Ioanna, PE, LEED AP, Senior Principal, Syska Hennessy Group. Newer data centers are turning to cooling systems that run on little or even no water.

For a recent 300,000-sf, 30 MW data center in Mexico, Syska Hennessy was going to go with water cooling, only to have the property owner revoke the client’s water-use privileges. Syska redesigned the mechanical and electrical systems to operate without water, using air-cooled chillers with integrated economizer cycles.

Page's Major foresees more liquefied immersion cooling, where servers get submerged in thermally conducted dielectric liquid. This method typically doesn’t require fans and allows the data center to run at hotter temperatures.

  

Related Stories

Data Centers | Feb 22, 2018

Demand for ‘hyperscale’ data centers continues to grow; U.S. leads the way

The number of so-called “hyperscale” data centers worldwide surpassed 390 at the end of 2017, with 69 more facilities in the works, according to Synergy Research Group.

Giants 400 | Oct 16, 2017

Data center market forecast: Clearly cloudy

Look for mission-critical construction to double in the next few years.

Data Centers | Oct 13, 2017

Top 35 data center construction firms

Turner Construction Co., Holder Construction, and DPR Constrcution top BD+C’s ranking of the nation’s largest data center sector contractors and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 12, 2017

Top 30 data center engineering firms

Syska Hennessy Group, AECOM, and Morrison Hershfield top BD+C’s ranking of the nation’s largest data center sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 11, 2017

Top 25 data center architecture firms

Jacobs, Corgan, and Gensler top BD+C’s ranking of the nation’s largest data center sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Data Centers | Aug 28, 2017

Do AEC firms have the wattage to meet the demands of a charged-up data center sector?

As construction and leasing surge, one big contractor worries about his industry’s talent shortage. 

Data Centers | Aug 16, 2017

The world’s largest data center is being built 140 miles north of the Arctic Circle

The 600,000-sm facility will be on a secure property surrounded by a moat.

Healthcare Facilities | Jul 25, 2017

Healthcare technology: Preparing for the world of tomorrow

This article outlines the current data center landscape in the healthcare sector, industry trends, and challenges and opportunities new technologies present to the healthcare space.

Data Centers | Jul 21, 2017

Operational wellness was an objective for a new 911 call center near San Antonio

The Operations Center consolidates activities that previously were being handled at 25 locations. 

Data Centers | Oct 14, 2016

Where data centers meet design

As technology continues to evolve, we have to simultaneously adapt and help our clients think beyond the short term, writes Gensler's Martin Gollwitzer.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021