Federal and local officials wielded shovels recently to signal the start of construction of a new National Institutes of Health-leased facility in the emerging, transit-friendly Twinbrook neighborhood of Montgomery County, Md.
James G. Davis Construction Corporation (DAVIS) and the JBG Companies are building a new home for 2,000 employees of the NIH’s National Institute of Allergy and Infectious Diseases (NIAID).
The new building, designed by Washington architect HOK, will be located at 5601 Fishers Lane in Twinbrook and will complement existing bioscience facilities nearby, which includes NIAID’s 150,000 square feet of laboratories already in the neighborhood.
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. The installation will feature an atrium entry lobby, a precast and glass exterior and will be certified LEED Silver. There is also a 5-story, concrete parking garage located adjacent to the building. NIAID signed a 15-year lease for its new quarters, which are expected to be completed in 2014.
In conjunction with this development, a new hiker/biker path will be constructed, which will connect the Twinbrook Metro Station to the wide network of trails in Rock Creek Park and beyond. BD+C
Related Stories
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.
| Feb 1, 2012
Increase notched in construction jobs, but unemployment rate still at 16%
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.