Denise Scott Brown, Hon. FAIA, and Robert Venturi, FAIA, were announced the winners of the 2016 AIA Gold Medal Award.
The award, voted on by the AIA’s Board of Directors, is the highest award the association can offer to an architect, and it “acknowledges a significant body of work that has had a lasting influence on the theory and practice of architecture,” according to a statement.
Scott Brown and Venturi, a team that has been married since 1967, have influenced up-and-coming architects over the years through their built work and writings.
Some notable projects that their firm, VSBA Architects and Planners, have worked on are the Museum of Contemporary Art in San Diego, the The Sainsbury Wing of the National Gallery in London, the Provincial Capital Building in Toulouse, France, the Seattle Art Museum, and buildings for several universities, including Brown, Ohio State, and Yale.
Venturi wrote the book Complexity and Contradiction in Architecture in 1966, and worked with Scott Brown and architect Steven Izenour on Learning from Las Vegas in 1972. The pair also wrote Architecture as Signs and Systems: for a Mannerist Time in 2004.
“This recognition will resonate with generations of architects,” 2015 AIA President Elizabeth Chu Richter, FAIA, said in a statement. “What Denise and Bob have done for the profession far exceeds the completion of a great building or two. Through a lifetime of inseparable collaboration, they changed the way we look at buildings and cities. Anything that is great in architecture today has been influenced in one way or another by their work."
The duo has won 17 state and local AIA awards and nine national AIA awards. In 1991, Venturi won the Pritzker Architecture Prize but Scott Brown was excluded; they sought to have Scott Brown honored retroactively in 2013. They will receive the 2016 Gold Medal at the AIA convention in Philadelphia in May.
Related Stories
| Jun 13, 2013
AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition
The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York.
| Jun 12, 2013
More than 90% of New York City schools have code violations
More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.