Denise Scott Brown, Hon. FAIA, and Robert Venturi, FAIA, were announced the winners of the 2016 AIA Gold Medal Award.
The award, voted on by the AIA’s Board of Directors, is the highest award the association can offer to an architect, and it “acknowledges a significant body of work that has had a lasting influence on the theory and practice of architecture,” according to a statement.
Scott Brown and Venturi, a team that has been married since 1967, have influenced up-and-coming architects over the years through their built work and writings.
Some notable projects that their firm, VSBA Architects and Planners, have worked on are the Museum of Contemporary Art in San Diego, the The Sainsbury Wing of the National Gallery in London, the Provincial Capital Building in Toulouse, France, the Seattle Art Museum, and buildings for several universities, including Brown, Ohio State, and Yale.
Venturi wrote the book Complexity and Contradiction in Architecture in 1966, and worked with Scott Brown and architect Steven Izenour on Learning from Las Vegas in 1972. The pair also wrote Architecture as Signs and Systems: for a Mannerist Time in 2004.
“This recognition will resonate with generations of architects,” 2015 AIA President Elizabeth Chu Richter, FAIA, said in a statement. “What Denise and Bob have done for the profession far exceeds the completion of a great building or two. Through a lifetime of inseparable collaboration, they changed the way we look at buildings and cities. Anything that is great in architecture today has been influenced in one way or another by their work."
The duo has won 17 state and local AIA awards and nine national AIA awards. In 1991, Venturi won the Pritzker Architecture Prize but Scott Brown was excluded; they sought to have Scott Brown honored retroactively in 2013. They will receive the 2016 Gold Medal at the AIA convention in Philadelphia in May.
Related Stories
| Feb 17, 2012
MacInnis joins Gilbane board of directors
MacInnis is the chairman and recently retired CEO of Connecticut-based EMCOR Group, Inc.
| Feb 16, 2012
Gain greater agility and profitability with ArchiCAD BIM software
White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.
| Feb 16, 2012
TLC Engineering for Architecture opens Chattanooga office
TLC Engineering for Architecture provides mechanical, electrical, structural, plumbing, fire protection, communication, technology, LEED, commissioning and energy auditing services.
| Feb 16, 2012
Summit Design + Build begins build-out for Emmi Solutions in Chicago
The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.
| Feb 16, 2012
Highland named president of McCarthy Building Companies’ California region
Highland moved into this new role in January 2012 following a six-month transition period with Carter Chappell, the company’s former president, California region.
| Feb 16, 2012
Big-box retailers not just for DIYers
Nearly half of all contractor purchases made from stores like Home Depot and Lowe's.
| Feb 16, 2012
4.8-megawatt solar power system completed at Jersey Gardens Mall
Solar array among the largest rooftop systems in North America.
| Feb 15, 2012
Fourth-generation Ryan to lead Ryan Companies AE team
Ryan leads a team of eight architects, four civil engineers, two landscape architects and two virtual building specialists in their efforts to realize their customer’s vision and needs through Ryan’s integrated project delivery system.
| Feb 15, 2012
NAHB sees gradual improvement in multifamily sales for boomers
However, since the conditions of the current overall housing market are limiting their ability to sell their existing homes, this market is not recovering as quickly as might have been expected.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.