Touted as the nation’s first carbon-positive hotel, Populus recently broke ground in downtown Denver. Scheduled to open in late 2023, Populus is a 13-story, 265-room hotel with a rooftop restaurant and bar, all designed by Studio Gang.
Developed by Urban Villages, the triangular-shaped, 130,000-square-foot building will be entirely carbon positive, from construction to operations. Populus will minimize its carbon footprint in the development stage by using low-carbon concrete mixes and high-recycled content materials, maximizing structural efficiency, using fewer finish materials, and minimizing waste. The team will consider the carbon footprint of the origin and creation of the materials as well as their transport. The hotel’s overall use (operational carbon) and every guest stay will be offset, in addition to the building’s embodied carbon.
The project also will involve an offsite ecological effort, including an initial commitment to plant trees that represent over 5,000 acres of forest, offsetting the equivalent of nearly 500,000 gallons of gas.
With design by Studio Gang, and with the Beck Group as the architect of record, Populus draws inspiration from the area’s iconic Aspen tree. Studio Gang designed the hotel, its first building in Colorado, with eye-shaped windows that echo the Aspen eyes. As part of the overall green vision, “lids” over each window extend slightly outward to shade the interior, improve energy performance, and channel rainwater.
Inside, the windows change in size to reflect the public or private aspect of various spaces—with windows up to 30 feet high at the building’s base. In the rooms, the windows not only provide immersive mountain and city views but also serve as seats or desks, further connecting occupants with the outdoors.
“Improving the resiliency of our cities has never been more urgent—and it includes reducing carbon emissions as well as strengthening community bonds,” Jeanne Gang, founder of Studio Gang, said in a statement. “We’ve designed Populus to be a new destination in downtown Denver that combines these environmental and social ambitions.”
On the Building Team:
Owner and/or developer: Urban Villages
Design architect: Studio Gang
Architect of record: The Beck Group
MEP engineer: Klok Group
Structural engineer: Studio NYL
General contractor/construction manager: Matt Archuletta
Related Stories
| Dec 10, 2013
Modular Pedia-Pod: Sustainability in healthcare construction [slideshow]
Greenbuild 2013 in Philadelphia was the site of a unique display—Pedia-Pod, a modular pediatric treatment room designed and built by NRB, in collaboration with the editors of Building Design+Construction, SGC Horizon LLC, and their team of medical design consultants.
| Dec 3, 2013
Creating a healthcare capital project plan: The truth behind the numbers
When setting up a capital project plan, it's one thing to have the data, but quite another to have the knowledge of the process.
| Nov 27, 2013
Pediatric hospitals improve care with flexible, age-sensitive design
Pediatric hospitals face many of the same concerns as their adult counterparts. Inpatient bed demand is declining, outpatient visits are soaring, and there is a higher level of focus on prevention and reduced readmissions.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Nov 19, 2013
Pediatric design in an adult hospital setting
Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.
| Nov 18, 2013
6 checkpoints when designing a pediatric healthcare unit
As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.