flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Denver transit project wins design-build Project of the Year honor

Denver transit project wins design-build Project of the Year honor

The Denver Union Station Transit Improvement Project is among 25 projects honored by the Design Build Institute of America for excellence in design-build project delivery.


By Design-Build Institute of America | October 8, 2014

The Design Build Institute of America (DBIA) has announced the 2014 Project of the Year and National Award of Excellence winners.

The Denver Union Station Transit Improvement Project has been bestowed with DBIA's highest honor, Project of the Year, with Agua Nueva, Golisano Institute for Sustainability, Henry M. Jackson Federal Building Modernization, and the San Diego International Airport Terminal 2 and Airside Expansion projects being specially recognized for excellence in the critical areas of design, process and teaming.

"This year's award competition was the most rigorous to date with a greater emphasis on best practices and teamwork, as well as the successful delivery of the project," says Lisa Washington, CAE, DBIA's Executive Director/CEO.

Recognized for exemplary collaboration and integration in design-build project delivery, the award-winning projects were evaluated by a distinguished panel of industry experts. This year, 25 projects in nine categories were awarded National Awards of Merit.

One project in each of the nine categories was then considered for best in category as a National Award of Excellence winner along with Excellence in Design, Process and Teaming awards and Project of the Year. The selected projects showcase design-build best practices, in addition to achieving budget and schedule goals and exceeding owner expectations. All photos courtesy of DBIA.

 

DBIA 2014 Project of the Year – Denver Union Station Transit Improvements Project

(pictured above)

The Denver Union Station Transit Improvements Project transformed 20 acres of blighted former rail yards into the vibrant centerpiece of a bustling downtown Denver, anchoring and facilitating connections between the region's transit system with all modes of public transit: an iconic, eight-track commuter rail train hall, new light-rail station and an airy, airport-like underground bus concourse with 22 bays for regional and commercial bus service. At $374.8 million and spanning 20 acres and seven city blocks, it is the largest multimodal project to seek LEED Silver certification from the USGBC. The project is a Public-Private Partnership (P3) successfully delivered under a design-build contract model.

The Project of the Year team includes: Owner: Denver Union Station Project Authority; Design-Builder, Construction Manager: Kiewit; Architect: Skidmore, Owings, and Merrill LLP; Engineer: AECOM; BIM Specialist/Construction: Legacy Mechanical Inc.; and Specialty Consultant: Hargreaves Associates.

"The remarkable Denver Union Station Project is a shining example of what can be accomplished through Design-Build Done Right," says Lisa Washington. "The project team truly took integrated project delivery to the next level by releasing design packages in alignment with construction activities, embedding lead architects and engineers in the contractors' offices and through weekly owner/architect/contractor meetings to ensure key decision-makers were frequently engaged. We could not be more proud to present this prestigious award to the Denver Union Station Project Authority and the entire project team as DBIA's 2014 Design-Build Project of the Year."

 

 

DBIA 2014 Excellence in Design – Golisano Institute for Sustainability and the Governor George Deukmejian Courthouse

The Golisano Institute for Sustainability at Rochester Institute of Technology (RIT) in Rochester, N.Y., wanted a signature building that would serve as a living laboratory for scientific discovery and experimental learning that could serve as the Western Gateway to RIT. The result is an 84,000-square-foot complex, comprised of a four-story research and three-story academic and office building connected by a four-story galleria. It houses laboratories, classrooms and office space, with high-performance design features that make it a living laboratory of sustainability. The Golisano Institute is among the first in the world to offer a Ph.D. program in sustainability.

 

The Governor George Deukmejian Courthouse was delivered through a unique Public-Private Partnership and is the first social infrastructure project in the United States procured under the principles of Performance-Based Infrastructure contracting. Constructed in downtown Long Beach, Calf., the design-build team successfully delivered the spectacular 545,000-square-foot courthouse and 399,000-square-foot parking facility 11 days ahead of schedule.

 

 

DBIA 2014 Excellence in Process – Agua Nueva Water Reclamation Facility

The Pima County Regional Wastewater Reclamation Department embarked on the largest capital program in its history, which includes the $172 million Agua Nueva Water Reclamation Facility in Tucson, Ariz. The 32-million-gallon-per-day facility produces A+ quality effluent and features state-of-the-art odor control technology. Key challenges were meeting stringent contractual/permit effluent requirements and compliance schedules, coordinating shutdown of the old facility with Agua Nueva startup, maintaining strong coordination with other projects and optimizing capital and life-cycle costs.

 

 

DBIA 2014 Excellence in Teaming – Henry M. Jackson Federal Building Modernization

The Henry M. Jackson Federal Building modernization in Seattle, Wash., served to reduce the building's energy consumption by 30 percent, increase the Energy Star score to 97 and achieve a LEED-EB Silver certification from the USGBC through multiple energy-related scopes. After shortlisting to three firms, cost and schedule were fixed to enable the teams to focus on innovative solutions to energy savings. To ensure accountability, the GSA used a performance guarantee that included one year of monitoring the Energy Use Intensity against goals established by the design-build teams, for which $1.8 million was held as retention.

 

 

DBIA 2014 National Award of Excellence by Category winners are:

• Aviation – The San Diego International Airport Terminal 2 and Airside Expansion, San Diego, Calif.
• Civic – FY11 228 PN UEPH Schofield Barracks, Fort Shafter, Oahu, Hawaii
• Commercial/Office – Wendell August, Grove City, Pa.
• Education – Golisano Institute for Sustainability Research Building, Rochester, N.Y.
• Healthcare – California Health Care Facility Stockton, Stockton, Calif.
• Industrial/Process/Research – Rolls-Royce Advanced Aerofoil Machining Facility, Prince George County, Va.
• Rehabilitation/Renovation/Restoration – Henry M. Jackson Federal Building Modernization, Seattle, Wash.
• Transportation – Denver Union Station Transit Improvements, Denver, Colo.
• Water/Wastewater - Agua Nueva Water Reclamation Facility, Tucson, Ariz.

Related Stories

| Mar 11, 2011

Community sports center in Nashville features NCAA-grade training facility

A multisport community facility in Nashville featuring a training facility that will meet NCAA Division I standards is being constructed by St. Louis-based Clayco and Chicago-based Pinnacle.

| Mar 11, 2011

Slam dunk for the University of Nebraska’s basketball arena

The University of Nebraska men’s and women’s basketball programs will have a new home beginning in 2013. Designed by the DLR Group, the $344 million West Haymarket Civic Arena in Lincoln, Neb., will have 16,000 seats, suites, club amenities, loge, dedicated locker rooms, training rooms, and support space for game operations.

| Mar 10, 2011

Steel Joists Clean Up a Car Wash’s Carbon Footprint

Open-web bowstring trusses and steel joists give a Utah car wash architectural interest, reduce its construction costs, and help green a building type with a reputation for being wasteful.

| Mar 10, 2011

How AEC Professionals Are Using Social Media

You like LinkedIn. You’re not too sure about blogs. For many AEC professionals, it’s still wait-and-see when it comes to social media.

| Mar 9, 2011

Hoping to win over a community, Facebook scraps its fortress architecture

Facebook is moving from its tony Palo Alto, Calif., locale to blue-collar Belle Haven, and the social network want to woo residents with community-oriented design.

| Mar 9, 2011

Winners of the 2011 eVolo Skyscraper Competition

Winners of the eVolo 2011 Skyscraper Competition include a high-rise recycling center in New Delhi, India, a dome-like horizontal skyscraper in France that harvests solar energy and collects rainwater, and the Hoover Dam reimagined as an inhabitable skyscraper.

| Mar 9, 2011

Igor Krnajski, SVP with Denihan Hospitality Group, on hotel construction and understanding the industry

Igor Krnajski, SVP for Design and Construction with Denihan Hospitality Group, New York, N.Y., on the state of hotel construction, understanding the hotel operators’ mindset, and where the work is.

| Mar 3, 2011

HDR acquires healthcare design-build firm Cooper Medical

HDR, a global architecture, engineering and consulting firm, acquired Cooper Medical, a firm providing integrated design and construction services for healthcare facilities throughout the U.S. The new alliance, HDR Cooper Medical, will provide a full service design and construction delivery model to healthcare clients.

| Mar 2, 2011

Design professionals grow leery of green promises

Legal claims over sustainability promises vs. performance of certified green buildings are beginning to mount—and so are warnings to A/E/P and environmental consulting firms, according to a ZweigWhite report.

| Mar 2, 2011

Cities of the sky

According to The Wall Street Journal, the Silk Road of the future—from Dubai to Chongqing to Honduras—is taking shape in urban developments based on airport hubs. Welcome to the world of the 'aerotropolis.'

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021