Des Moines University has broken ground on its new campus on 88 acres in West Des Moines at 8025 Grand Avenue.
The campus will include flexible environments that allow for didactic, active-learning and small group work. Learning studios and laboratories will be technology-rich while simulated health care environments will reflect those of modern care facilities, providing learners with a safe environment in which to practice patient care.
Wellness and recreation facilities will allow students, faculty, and staff to stay active and healthy. An integrated student clinic will provide access to care for students to maintain a well-balanced lifestyles and a private student counseling suite ensures students have access to mental health care. The campus will also feature a mix of open and enclosed collaboration spaces that converge in the heart of the campus.
See Also: Performance Hall at the Taipei Music Center opens in the Nangang District
The entire campus has also been designed with the ability to grow and evolve over time. Flexibility will allow the university to respond to future needs in health care and health care education.
In addition to RDG Planning & Design, the build team also includes Turner Construction as the general contractor.
The campus is expected to open in 2023, just in time for the school’s 125th anniversary.
Related Stories
| May 10, 2014
How your firm can gain an edge on university projects
Top administrators from five major universities describe how they are optimizing value on capital expenditures, financing, and design trends—and how their AEC partners can better serve them and other academic clients.
| May 1, 2014
First look: Cal State San Marcos's posh student union complex
The new 89,000-sf University Student Union at CSUSM features a massive, open-air amphitheater, student activity center with a game lounge, rooftop garden and patio, and ballroom space.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
Smart Buildings | Apr 28, 2014
Cities Alive: Arup report examines latest trends in urban green spaces
From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 8, 2014
Science, engineering find common ground on the Northeastern University campus [slideshow]
The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.