Des Moines University has broken ground on its new campus on 88 acres in West Des Moines at 8025 Grand Avenue.
The campus will include flexible environments that allow for didactic, active-learning and small group work. Learning studios and laboratories will be technology-rich while simulated health care environments will reflect those of modern care facilities, providing learners with a safe environment in which to practice patient care.
Wellness and recreation facilities will allow students, faculty, and staff to stay active and healthy. An integrated student clinic will provide access to care for students to maintain a well-balanced lifestyles and a private student counseling suite ensures students have access to mental health care. The campus will also feature a mix of open and enclosed collaboration spaces that converge in the heart of the campus.
See Also: Performance Hall at the Taipei Music Center opens in the Nangang District
The entire campus has also been designed with the ability to grow and evolve over time. Flexibility will allow the university to respond to future needs in health care and health care education.
In addition to RDG Planning & Design, the build team also includes Turner Construction as the general contractor.
The campus is expected to open in 2023, just in time for the school’s 125th anniversary.
Related Stories
| Nov 13, 2012
Have colleges + universities gone too far with "Quality of Life" buildings?
We'd like your input - recent projects, photo/s, renderings, and expert insight - on an important article we're working on for our Jan 2013 issue
| Nov 11, 2012
Greenbuild 2012 Report: Higher Education
More and more colleges and universities see sustainainably designed buildings as a given
| Oct 30, 2012
Lord, Aeck & Sargent announces four student life facility wins
Projects recognize the architecture firm’s expertise on a nationwide basis.
| Oct 4, 2012
2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.
Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.
| Sep 19, 2012
Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth
By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.
| Sep 6, 2012
CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building
The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.
| Sep 5, 2012
Skanska tops out residence hall complex at the University of Delaware
Construction firm achieves structural milestone for $71 million student housing expansion project.
| Aug 30, 2012
John S Clark Co. completes teaching lab at UNC Wilmington
Three-story building provides offices, classrooms, and labs.
| Aug 7, 2012
Pioneering revival
Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.